2G's Solar Electric

How many solar installs has 2G's Solar Electric done in California, and which license number is on its installs?

2G's Solar Electric has 48 residential solar installs interconnected in California, active in the records from 2012 through 2026 (Jul 9, 2012 to May 7, 2026), most of them in Fresno County (38), Madera County (3) and Stanislaus County (3). CSLB lists license 424766 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Jun 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
48
Last 24 months
4
Total capacity
369.9 kW DC
Median system size
7.8 kW DC
With battery storage
8.3% all time; 100.0% last 24 months
Third-party owned
0.0% of 48 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
5 installs, latest May 7, 2026
Ownership types recorded
none recorded
First install
Jul 9, 2012
Latest install
May 7, 2026
Counties
7
Utilities
PGE 45, SCE 3
CSLB license
424766

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2012 to 2026

YearInstalls interconnectedWith battery storage
201240
201310
201430
201560
201650
201790
201840
201910
202000
202130
202240
202330
202421
202522
2026 (through Aug 31, 2026)11

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

5 of its 48 interconnected installs (10.4% of the 48 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 80.0% of those include battery storage. The latest Net Billing Tariff install was approved May 7, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.01939.6%not counted
NEM 2.02450.0%0 (0.0%)
Net Billing Tariff510.4%4 (80.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on 2G's Solar Electric’s installs. No residential system in the file lists a third-party owner name that matches 2G's Solar Electric exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 4 of 2G's Solar Electric’s 4 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (2, 50.0%) used modules recorded as Aptos Solar.

In the last 24 months, 4 of 2G's Solar Electric’s 4 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (4, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 4 of 2G's Solar Electric’s 4 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (4, 100.0%) used batteries recorded as Enphase.

4 of 4 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerAptos Solar2not in top list
JA Solar1not in top list
Qcells15
Inverter makerEnphase444
Battery makerEnphase44

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 48 of 48 installs, inverters on 48. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
424766Sole owner license (name not shown)CLEARB General Building Contractor; C-10 Electrical ContractorJul 6, 1982Jun 30, 202843

License numbers are the ones the utilities recorded on the interconnection applications (43 of 48 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 424766. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Fresno38
Madera3
Stanislaus3
Kings1
Riverside1
Santa Cruz1
Tulare1

Top cities

CityInstalls
Fresno22
Clovis7
Sanger3
Madera2
Oakdale2
Prather2
Auberry1
Coarsegold1
Five Points1
Lemoore1
Palm Desert1
Riverbank1
Santa Cruz1
Shaver Lake1
Tulare1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
2G's Solar Electric32
2G'S SOLAR ELECTRIC16

Common questions

Where does 2G's Solar Electric install solar?

Its installs are spread across 7 counties. The most are in Fresno County (38 installs), followed by Madera County (3).

How often does 2G's Solar Electric install batteries with solar?

8.3% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (4 of 4).

How many 2G's Solar Electric installs are under NEM 3.0 (the Net Billing Tariff)?

5 of its 48 interconnected installs (10.4% of the 48 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 80.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.