A-C Electric Company has 156 residential solar installs interconnected in California, active in the records from 2010 through 2023 (Oct 27, 2010 to Apr 27, 2023), most of them in Kern County (122), Fresno County (14) and Tulare County (12). CSLB lists license 99849 (A-C ELECTRIC COMPANY) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications A, B, C-10, C-12, D-42, expires Sep 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
156
Last 24 months
0
Total capacity
1,211.1 kW DC
Median system size
7.2 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
3.2% of 154 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
lease 5
First install
Oct 27, 2010
Latest install
Apr 27, 2023
Counties
7
Utilities
PGE 141, SCE 15
CSLB license
99849

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2010 to 2026

YearInstalls interconnectedWith battery storage
201010
201170
2012290
2013520
2014470
2015130
201650
201710
201800
201900
202000
202100
202200
202310
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 156 interconnected installs with a tariff recorded (156) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.015498.7%not counted
NEM 2.021.3%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 5 of A-C Electric Company’s installs the utility recorded a third-party ownership type: PPA 0, lease 5, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches A-C Electric Company exactly.

Third-party owner named on its installsInstalls
SunPower Capital LLC4
SunPower Solar Program I LLC1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 138 of A-C Electric Company’s 156 installs name a module maker in the “Generator Manufacturer” fields, and most of those (74, 53.6%) used modules recorded as SolarWorld.

Across all years, 156 of A-C Electric Company’s 156 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (80, 51.3%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSolarWorld074
SunPower048
Qcells06
Conergy02
ET Solar Industry, Ltd.02
Inverter makerEnphase080
SunPower031
Power-One028
SMA012
SolarEdge03

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 138 of 156 installs, inverters on 156. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names A-C Electric Company as developer on 1 battery storage project and as installer on 1 (1 name it as both), 1 projects in all with 514 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Apr 14, 2023 to Apr 14, 2023.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Reserved1514$94,713

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Large-Scale Storage1514$94,7130$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
99849A-C ELECTRIC COMPANY (Corporation)CLEARA General Engineering Contractor; B General Building Contractor; C-10 Electrical Contractor; C-12; D-42Jan 2, 1948Sep 30, 202853

License numbers are the ones the utilities recorded on the interconnection applications (54 of 156 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 99849. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Kern122
Fresno14
Tulare12
Kings4
Merced2
Madera1
Santa Clara1

Top cities

CityInstalls
Bakersfield118
Visalia9
Fresno6
Clovis4
Hanford3
Kingsburg2
Merced2
Reedley2
Shafter2
Buttonwillow1
Lemoore1
Los Altos1
Madera1
Porterville1
Strathmore1

Names as recorded by the utilities

The utilities recorded this installer under 8 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
A-C Electric Company142
A-C ELECTRIC COMPANY6
A-C Electric2
A-C ELECTRIC CO2
A C Electric1
A-C Electric Co1
A-C electric Company1
A-C Electric company1

Common questions

Where does A-C Electric Company install solar?

Its installs are spread across 7 counties. The most are in Kern County (122 installs), followed by Fresno County (14).

How often does A-C Electric Company install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many A-C Electric Company installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 156 interconnected installs with a tariff recorded (156) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.