A W S ELECTRICAL & SOLAR INC

How many solar installs has A W S ELECTRICAL & SOLAR INC done in California, and which license number is on its installs?

A W S ELECTRICAL & SOLAR INC has 48 residential solar installs interconnected in California, active in the records from 2017 through 2021 (Aug 3, 2017 to Jul 19, 2021), most of them in Los Angeles County (30), Ventura County (11) and Orange County (4). CSLB lists license 901196 (A W S ELECTRICAL SERVICES) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jul 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
48
Last 24 months
0
Total capacity
345.2 kW DC
Median system size
6.5 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 48 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Aug 3, 2017
Latest install
Jul 19, 2021
Counties
4
Utilities
SCE 48
CSLB license
901196

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2017 to 2026

YearInstalls interconnectedWith battery storage
201760
201860
201940
2020260
202160
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 48 interconnected installs with a tariff recorded (48) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.048100.0%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on A W S ELECTRICAL & SOLAR INC’s installs. No residential system in the file lists a third-party owner name that matches A W S ELECTRICAL & SOLAR INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 48 of A W S ELECTRICAL & SOLAR INC’s 48 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (24, 50.0%) used modules recorded as Panasonic.

Across all years, 48 of A W S ELECTRICAL & SOLAR INC’s 48 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (28, 58.3%) used inverters recorded as SolarEdge.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerPanasonic024
REC08
Qcells07
Hyundai05
Canadian Solar02
Inverter makerSolarEdge028
Enphase019
SunPower01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 48 of 48 installs, inverters on 48. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names A W S ELECTRICAL & SOLAR INC as developer on 0 battery storage projects and as installer on 1 (0 name it as both), 1 projects in all with 10 kWh of storage. 1 have the status Paid, with $1,738 in current incentive allocations. Applications were received from May 11, 2022 to May 11, 2022.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid110$1,738

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage110$1,7381$1,738

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
901196A W S ELECTRICAL SERVICES (Corporation)CLEARC-10 Electrical ContractorJul 30, 2007Jul 31, 202848

License numbers are the ones the utilities recorded on the interconnection applications (48 of 48 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 901196. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles30
Ventura11
Orange4
San Bernardino3

Top cities

CityInstalls
Camarillo6
Culver City3
Yorba Linda3
Fontana2
Hermosa Beach2
Lomita2
Long Beach2
Monrovia2
Rancho Palos Verdes2
Santa Clarita2
Simi Valley2
Ventura2
Agoura Hills1
Alhambra1
Claremont1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
A W S ELECTRICAL & SOLAR INC48

Common questions

Where does A W S ELECTRICAL & SOLAR INC install solar?

Its installs are spread across 4 counties. The most are in Los Angeles County (30 installs), followed by Ventura County (11).

How often does A W S ELECTRICAL & SOLAR INC install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many A W S ELECTRICAL & SOLAR INC installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 48 interconnected installs with a tariff recorded (48) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.