ACR SOLAR

How many solar installs has ACR SOLAR done in California, and which license number is on its installs?

ACR SOLAR has 92 residential solar installs interconnected in California, active in the records from 2018 through 2026 (Oct 17, 2018 to Apr 7, 2026), most of them in Placer County (27), El Dorado County (26) and Yolo County (18). The license number recorded on most of its installs, 979954, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
92
Last 24 months
26
Total capacity
718.9 kW DC
Median system size
6.5 kW DC
With battery storage
32.6% all time; 73.1% last 24 months
Third-party owned
0.0% of 92 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
29 installs, latest Mar 5, 2026
Ownership types recorded
none recorded
Median battery size
10 kWh (12 installs list a capacity)
First install
Oct 17, 2018
Latest install
Apr 7, 2026
Counties
11
Utilities
PGE 92
CSLB license
979954

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
201820
201920
202000
202100
202230
2023464
20241910
20251613
2026 (through Aug 31, 2026)43

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

29 of its 92 interconnected installs (31.5% of the 92 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 89.7% of those include battery storage. The latest Net Billing Tariff install was approved Mar 5, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.011.1%not counted
NEM 2.06267.4%3 (4.8%)
Net Billing Tariff2931.5%26 (89.7%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on ACR SOLAR’s installs. No residential system in the file lists a third-party owner name that matches ACR SOLAR exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 22 of ACR SOLAR’s 26 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (10, 45.5%) used modules recorded as Silfab.

In the last 24 months, 26 of ACR SOLAR’s 26 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (11, 42.3%) used inverters recorded as SolarEdge.

In the last 24 months, 16 of ACR SOLAR’s 26 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (9, 56.3%) used batteries recorded as PointGuard Energy Inc..

26 of 30 battery-paired PG&E and SCE installs (86.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSilfab1063
Mission Solar44
JA Solar33
REC22
LG1not in top list
Inverter makerSolarEdge1170
PointGuard Energy Inc.99
Tesla88
Enphase17
Fronius1not in top list
Battery makerPointGuard Energy Inc.99
Tesla55
SolarEdge29

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 80 of 92 installs, inverters on 92. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
979954Not found in the CSLB License Master file pulled Nov 4, 202692

License numbers are the ones the utilities recorded on the interconnection applications (92 of 92 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Other names reported under the same license

Counties

CountyInstalls
Placer27
El Dorado26
Yolo18
San Joaquin5
Contra Costa4
Solano3
Yuba3
Amador2
Napa2
Nevada1
Stanislaus1

Top cities

CityInstalls
El Dorado Hills15
West Sacramento10
Rocklin8
Davis6
Lincoln6
Auburn5
Loomis5
Placerville3
Shingle Springs3
Stockton3
Bay Point2
Camino2
Plumas Lake2
Pollock Pines2
Vacaville2

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ACR SOLAR87
ACR Solar5

Common questions

Where does ACR SOLAR install solar?

Its installs are spread across 11 counties. The most are in Placer County (27 installs), followed by El Dorado County (26).

How often does ACR SOLAR install batteries with solar?

32.6% of its interconnected solar installs include battery storage across all years, and 73.1% in the last 24 months (19 of 26).

How many ACR SOLAR installs are under NEM 3.0 (the Net Billing Tariff)?

29 of its 92 interconnected installs (31.5% of the 92 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 89.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.