Advanced Improvements Inc

How many solar installs has Advanced Improvements Inc done in California, and which license number is on its installs?

Advanced Improvements Inc has 461 residential solar installs interconnected in California, active in the records from 2011 through 2026 (Sep 29, 2011 to Mar 27, 2026), most of them in Orange County (271), Los Angeles County (85) and Riverside County (46). CSLB lists license 947761 (ADVANCED IMPROVEMENTS INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-20, C-36, C-39, expires May 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
461
Last 24 months
24
Total capacity
3,380.4 kW DC
Median system size
6.6 kW DC
With battery storage
1.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 435 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
11 installs, latest Mar 27, 2026
Ownership types recorded
none recorded
Median battery size
15.1 kWh (4 installs list a capacity)
First install
Sep 29, 2011
Latest install
Mar 27, 2026
Counties
6
Utilities
SCE 385, SDGE 76
CSLB license
947761

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2011 to 2026

YearInstalls interconnectedWith battery storage
201130
201220
201390
201430
2015740
2016880
2017780
2018290
2019260
2020300
2021201
2022180
2023422
2024181
2025100
2026 (through Aug 31, 2026)110

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

11 of its 461 interconnected installs (2.4% of the 461 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 11.1% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Mar 27, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.021646.9%not counted
NEM 2.023450.8%3 (1.5%)
Net Billing Tariff112.4%1 (11.1%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Advanced Improvements Inc’s installs. No residential system in the file lists a third-party owner name that matches Advanced Improvements Inc exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 24 of Advanced Improvements Inc’s 24 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (7, 29.2%) used modules recorded as United Renewable Energy.

In the last 24 months, 24 of Advanced Improvements Inc’s 24 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (23, 95.8%) used inverters recorded as Enphase.

In the last 24 months, none of Advanced Improvements Inc’s 24 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

4 of 4 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerUnited Renewable Energy761
Znshine7not in top list
UnitedRenewableEnergyCo.,Ltd.5not in top list
Qcells444
Yingli1not in top list
Inverter makerEnphase23392
ABB1not in top list
Battery makerEnphase04

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 454 of 461 installs, inverters on 452. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Advanced Improvements Inc as developer on 3 battery storage projects and as installer on 3 (3 name it as both), 3 projects in all with 68 kWh of storage. 1 have the status Paid, with $29,118 in current incentive allocations. Applications were received from Aug 19, 2021 to Jun 16, 2023.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid129$29,118
Cancelled119$2,912
RRF Rejected119$3,882

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency129$29,1181$29,118
Small Residential Storage119$2,9120$0
Not stated119$3,8820$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
947761ADVANCED IMPROVEMENTS INC (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-36; C-39 Roofing ContractorMay 26, 2010May 31, 2028425

License numbers are the ones the utilities recorded on the interconnection applications (428 of 461 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 947761. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Advanced Improvements Inc’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2023Total
unincorporated San Diego County94776111

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Orange271
Los Angeles85
Riverside46
San Bernardino31
San Diego27
Ventura1

Top cities

CityInstalls
Yorba Linda35
Irvine28
San Clemente23
Corona22
Fullerton21
Long Beach19
Laguna Hills13
Santa Ana13
Laguna Niguel12
Placentia12
Seal Beach12
Cypress10
Downey10
Fountain Valley8
Lake Forest8

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ADVANCED IMPROVEMENTS INC189
Advanced Improvements Inc177
Advanced Improvements81
ADVANCED IMPROVEMENTS12
Advanced Improvements Inc.2

Common questions

Where does Advanced Improvements Inc install solar?

Its installs are spread across 6 counties. The most are in Orange County (271 installs), followed by Los Angeles County (85).

How often does Advanced Improvements Inc install batteries with solar?

1.0% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 17). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Advanced Improvements Inc installs are under NEM 3.0 (the Net Billing Tariff)?

11 of its 461 interconnected installs (2.4% of the 461 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 11.1% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.