ALL AMERICAN CONSTRUCTION AND ELECTRIC INC

How many solar installs has ALL AMERICAN CONSTRUCTION AND ELECTRIC INC done in California, and which license number is on its installs?

ALL AMERICAN CONSTRUCTION AND ELECTRIC INC has 37 residential solar installs interconnected in California, active in the records from 2019 through 2021 (Nov 26, 2019 to Aug 26, 2021), most of them in Fresno County (13), Kern County (10) and San Luis Obispo County (8). The license number recorded on most of its installs, 1058026, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
37
Last 24 months
0
Total capacity
277.1 kW DC
Median system size
7 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
8.1% of 37 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 3
First install
Nov 26, 2019
Latest install
Aug 26, 2021
Counties
8
Utilities
PGE 35, SCE 2
CSLB license
1058026

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
201930
2020210
2021130
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 37 interconnected installs with a tariff recorded (37) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.037100.0%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 3 of ALL AMERICAN CONSTRUCTION AND ELECTRIC INC’s installs the utility recorded a third-party ownership type: PPA 3, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches ALL AMERICAN CONSTRUCTION AND ELECTRIC INC exactly.

Third-party owner named on its installsInstalls
Solkraft3

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 37 of ALL AMERICAN CONSTRUCTION AND ELECTRIC INC’s 37 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (15, 40.5%) used modules recorded as Solaria.

Across all years, 37 of ALL AMERICAN CONSTRUCTION AND ELECTRIC INC’s 37 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (26, 70.3%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSolaria015
Qcells012
Canadian Solar05
Silfab03
China Sunergy (Nanjing)02
Inverter makerEnphase026
APsystems (Altenergy Power System)06
SolarEdge03
Qcells01
SMA01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 37 of 37 installs, inverters on 37. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1058026Not found in the CSLB License Master file pulled Nov 4, 202637

License numbers are the ones the utilities recorded on the interconnection applications (37 of 37 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Fresno13
Kern10
San Luis Obispo8
Tulare2
Kings1
Madera1
Monterey1
Santa Clara1

Top cities

CityInstalls
Bakersfield10
Fresno7
Paso Robles6
Clovis4
Arroyo Grande1
Atascadero1
Coarsegold1
Fowler1
Friant1
Gilroy1
Lemoore1
San Miguel1
Tulare1
Visalia1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ALL AMERICAN CONSTRUCTION AND ELECTRIC INC37

Common questions

Where does ALL AMERICAN CONSTRUCTION AND ELECTRIC INC install solar?

Its installs are spread across 8 counties. The most are in Fresno County (13 installs), followed by Kern County (10).

How often does ALL AMERICAN CONSTRUCTION AND ELECTRIC INC install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many ALL AMERICAN CONSTRUCTION AND ELECTRIC INC installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 37 interconnected installs with a tariff recorded (37) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.