Altair Solar Inc

How many solar installs has Altair Solar Inc done in California, and which license number is on its installs?

Altair Solar Inc has 1,413 residential solar installs interconnected in California, active in the records from 2015 through 2025 (May 23, 2015 to Mar 29, 2025), most of them in Orange County (1,118), Los Angeles County (135) and Riverside County (75). The license number recorded on most of its installs, 1001983, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
1,413
Last 24 months
4
Total capacity
10,959.5 kW DC
Median system size
7.4 kW DC
With battery storage
8.3% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 25.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 1,412 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
20 installs, latest Mar 21, 2025
Ownership types recorded
none recorded
Median battery size
10.1 kWh (95 installs list a capacity)
First install
May 23, 2015
Latest install
Mar 29, 2025
Counties
6
Utilities
SCE 1,145, SDGE 265, PGE 3
CSLB license
1001983

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
201580
2016230
2017210
2018703
20192602
20202292
202130312
202221326
202323426
20245023
202521
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

20 of its 1,413 interconnected installs (1.4% of the 1,413 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Mar 21, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0312.2%not counted
NEM 2.01,36296.4%76 (6.9%)
Net Billing Tariff201.4%18 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Altair Solar Inc’s installs. No residential system in the file lists a third-party owner name that matches Altair Solar Inc exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 4 of Altair Solar Inc’s 4 installs name a module maker in the “Generator Manufacturer” fields, and most of those (3, 75.0%) used modules recorded as Panasonic.

In the last 24 months, 4 of Altair Solar Inc’s 4 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (2, 50.0%) used inverters recorded as Enphase.

In the last 24 months, 1 of Altair Solar Inc’s 4 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as Enphase.

78 of 95 battery-paired PG&E and SCE installs (82.1%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerPanasonic3513
REC183
Inverter makerEnphase2906
SolarEdge1366
Tesla120
Battery makerEnphase169

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 1,361 of 1,413 installs, inverters on 1,413. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Altair Solar Inc as developer on 15 battery storage projects and as installer on 15 (15 name it as both), 15 projects in all with 405 kWh of storage. 12 have the status Paid, with $93,258 in current incentive allocations. Applications were received from Jun 21, 2018 to Jul 8, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid12175$93,258
Cancelled3231$158,749

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage10114$25,6859$24,229
Equity Resiliency499$90,4893$69,029
Non-Residential Storage Equity1192$135,8330$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1001983Not found in the CSLB License Master file pulled Nov 4, 20261,409

License numbers are the ones the utilities recorded on the interconnection applications (1,411 of 1,413 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Orange1,118
Los Angeles135
Riverside75
San Diego59
San Bernardino23
Santa Clara3

Top cities

CityInstalls
Irvine299
Mission Viejo71
San Clemente60
Orange53
Huntington Beach52
Laguna Niguel46
Yorba Linda45
Santa Ana43
Corona39
Fullerton39
Tustin31
Lake Forest30
San Juan Capo30
Ladera Ranch29
Laguna Hills29

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ALTAIR SOLAR INC762
Altair Solar Inc625
Altair Solar INC21
Altair Solar4
Altair Solar INC.1

Common questions

Where does Altair Solar Inc install solar?

Its installs are spread across 6 counties. The most are in Orange County (1,118 installs), followed by Los Angeles County (135).

How often does Altair Solar Inc install batteries with solar?

8.3% of its interconnected solar installs include battery storage across all years, and 25.0% in the last 24 months (1 of 4). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Altair Solar Inc installs are under NEM 3.0 (the Net Billing Tariff)?

20 of its 1,413 interconnected installs (1.4% of the 1,413 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.