AMPWRX

How many solar installs has AMPWRX done in California, and which license number is on its installs?

AMPWRX has 169 residential solar installs interconnected in California, active in the records from 2021 through 2026 (Oct 26, 2021 to Jun 26, 2026), most of them in San Joaquin County (74), Calaveras County (48) and Contra Costa County (9). CSLB lists license 1077832 (AMPWRX) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jul 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
169
Last 24 months
21
Total capacity
1,406.8 kW DC
Median system size
7.7 kW DC
With battery storage
16.6% all time; 42.9% last 24 months
Third-party owned
0.6% of 169 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
30 installs, latest Jun 26, 2026
Ownership types recorded
PPA 1
Median battery size
16.1 kWh (22 installs list a capacity)
First install
Oct 26, 2021
Latest install
Jun 26, 2026
Counties
16
Utilities
PGE 163, SCE 6
CSLB license
1077832

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
202150
2022437
2023787
2024276
2025115
2026 (through Aug 31, 2026)53

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

30 of its 169 interconnected installs (17.8% of the 169 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 33.3% of those include battery storage. The latest Net Billing Tariff install was approved Jun 26, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.010.6%not counted
NEM 2.013881.7%17 (12.3%)
Net Billing Tariff3017.8%10 (33.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of AMPWRX’s installs the utility recorded a third-party ownership type: PPA 1, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches AMPWRX exactly.

Third-party owner named on its installsInstalls
VIVINT SOLAR DEVELOPER LLC1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 20 of AMPWRX’s 21 installs name a module maker in the “Generator Manufacturer” fields, and most of those (13, 65.0%) used modules recorded as Silfab.

In the last 24 months, 21 of AMPWRX’s 21 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (8, 38.1%) used inverters recorded as Sol-Ark.

In the last 24 months, 2 of AMPWRX’s 21 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (1, 50.0%) used batteries recorded as Fortress Power LLC.

2 of 28 battery-paired PG&E and SCE installs (7.1%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSilfab13130
Aptos Solar44
Discover Energy Systems Corp.3not in top list
Mission Solar2not in top list
Renon Power Technology Inc2not in top list
Inverter makerSol-Ark826
Enphase347
GoodWe Technologies Co., Ltd.331
SolarEdge361
Solis (Ginlong)2not in top list
Battery makerFortress Power LLC11
PointGuard Energy Inc.11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 160 of 169 installs, inverters on 169. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names AMPWRX as developer on 2 battery storage projects and as installer on 2 (2 name it as both), 2 projects in all with 23 kWh of storage. 2 have the status Paid, with $16,712 in current incentive allocations. Applications were received from Nov 16, 2021 to Jan 5, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid223$16,712

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency116$15,5581$15,558
Small Residential Storage18$1,1541$1,154

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1077832AMPWRX (Corporation)CLEARC-10 Electrical ContractorJul 7, 2021Jul 31, 2027169

License numbers are the ones the utilities recorded on the interconnection applications (169 of 169 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1077832. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
San Joaquin74
Calaveras48
Contra Costa9
Tuolumne7
Alameda5
El Dorado5
Los Angeles5
Stanislaus5
Sonoma3
Amador2
Fresno1
Kings1
Mariposa1
San Benito1
Santa Cruz1
Solano1

Top cities

CityInstalls
Murphys29
Stockton24
Lodi13
Acampo12
Copperopolis12
Woodbridge9
Shingle Springs5
Manteca4
Oakdale4
Palmdale4
Hayward3
Lockeford3
Valley Springs3
Brentwood2
Burson2

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
AMPWRX169

Common questions

Where does AMPWRX install solar?

Its installs are spread across 16 counties. The most are in San Joaquin County (74 installs), followed by Calaveras County (48).

How often does AMPWRX install batteries with solar?

16.6% of its interconnected solar installs include battery storage across all years, and 42.9% in the last 24 months (9 of 21).

How many AMPWRX installs are under NEM 3.0 (the Net Billing Tariff)?

30 of its 169 interconnected installs (17.8% of the 169 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 33.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.