ASI Hastings, Inc

How many solar installs has ASI Hastings, Inc done in California, and which license number is on its installs?

ASI Hastings, Inc has 2,526 residential solar installs interconnected in California, active in the records from 2011 through 2025 (Nov 30, 2011 to Sep 11, 2025), most of them in San Diego County (2,488) and Orange County (38). CSLB lists license 513115 (THE WHITE GLOVE GUYS, PLUMBING DRAINS HEATING AIR CONDITIONING) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-20, C-36, C-46, expires Jun 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
2,526
Last 24 months
3
Total capacity
15,205.8 kW DC
Median system size
5.6 kW DC
With battery storage
not recorded (SDG&E files batteries as separate projects, not on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
1.0% of 1,777 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
5 installs, latest Sep 11, 2025
Ownership types recorded
PPA 4, lease 8, other 6
First install
Nov 30, 2011
Latest install
Sep 11, 2025
Counties
2
Utilities
SDGE 2,526
CSLB license
513115

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2011 to 2026

YearInstalls interconnectedWith battery storage
201120
2012510
20132130
20143190
20154570
20165570
20172860
20181440
20191760
20201150
20211270
2022700
202340
202430
202520
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

5 of its 2,526 interconnected installs (0.2% of the 2,526 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Sep 11, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.01,37954.6%not counted
NEM 2.01,14245.2%not recorded
Net Billing Tariff50.2%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 18 of ASI Hastings, Inc’s installs the utility recorded a third-party ownership type: PPA 4, lease 8, prepaid lease 0, other 6. Across all installers, 11 residential systems list a third-party owner name that matches ASI Hastings, Inc exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
ASI HASTINGS11
SUNNOVA4
ASI SOLAR3

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 3 of ASI Hastings, Inc’s 3 installs name a module maker in the “Generator Manufacturer” fields, and most of those (2, 66.7%) used modules recorded as Qcells.

In the last 24 months, 3 of ASI Hastings, Inc’s 3 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (3, 100.0%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells2188
LONGi1not in top list
Inverter makerEnphase31,456

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 2,401 of 2,526 installs, inverters on 2,429. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names ASI Hastings, Inc as developer on 0 battery storage projects and as installer on 1 (0 name it as both), 1 projects in all with 8 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Feb 16, 2021 to Feb 16, 2021.

By status

Status as publishedProjectsStorage kWhCurrent incentive
RRF Rejected18$1,679

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Not stated18$1,6790$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
513115THE WHITE GLOVE GUYS, PLUMBING DRAINS HEATING AIR CONDITIONING (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-36; C-46 Solar ContractorJun 24, 1987Jun 30, 20271,207

License numbers are the ones the utilities recorded on the interconnection applications (1,211 of 2,526 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 513115. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list ASI Hastings, Inc’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023Total
unincorporated San Diego County51311542432618152146

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego2,488
Orange38

Top cities

CityInstalls
San Diego997
El Cajon199
Chula Vista180
La Mesa111
Santee96
Escondido89
Poway82
Oceanside78
Carlsbad77
Spring Valley62
Encinitas60
Lakeside59
Fallbrook46
La Jolla41
Vista39

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ASI Hastings, Inc2,526

Common questions

Where does ASI Hastings, Inc install solar?

Its installs are spread across 2 counties. The most are in San Diego County (2,488 installs), followed by Orange County (38).

How often does ASI Hastings, Inc install batteries with solar?

Battery storage is not recorded on its interconnected solar installs: SDG&E files a battery as its own project record, not on the solar record.

How many ASI Hastings, Inc installs are under NEM 3.0 (the Net Billing Tariff)?

5 of its 2,526 interconnected installs (0.2% of the 2,526 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.