AZ Solar

How many solar installs has AZ Solar done in California, and which license number is on its installs?

AZ Solar has 34 residential solar installs interconnected in California, active in the records from 2012 through 2025 (Jan 19, 2012 to Oct 11, 2025), most of them in Los Angeles County (23), San Bernardino County (5) and Orange County (4). CSLB lists license 965472 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-46, expires Sep 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
34
Last 24 months
2
Total capacity
189.1 kW DC
Median system size
5.1 kW DC
With battery storage
0.0% all time; 0.0% last 24 months
Third-party owned
3.3% of 30 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
2 installs, latest Oct 11, 2025
Ownership types recorded
other 1
First install
Jan 19, 2012
Latest install
Oct 11, 2025
Counties
4
Utilities
SCE 34
CSLB license
965472

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2012 to 2026

YearInstalls interconnectedWith battery storage
201260
201350
201480
201550
201630
201730
201810
201900
202000
202100
202200
202310
202410
202510
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

2 of its 34 interconnected installs (5.9% of the 34 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Oct 11, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.03088.2%not counted
NEM 2.025.9%0 (0.0%)
Net Billing Tariff25.9%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of AZ Solar’s installs the utility recorded a third-party ownership type: PPA 0, lease 0, prepaid lease 0, other 1. No residential system in the file lists a third-party owner name that matches AZ Solar exactly.

Third-party owner named on its installsInstalls
Oliver Law1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 2 of AZ Solar’s 2 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (1, 50.0%) used modules recorded as Phono Solar Technology.

In the last 24 months, 2 of AZ Solar’s 2 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (2, 100.0%) used inverters recorded as APsystems (Altenergy Power System).

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerPhono Solar Technology11
Suzhou Talesun Solar Technologies1not in top list
Inverter makerAPsystems (Altenergy Power System)22

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 14 of 34 installs, inverters on 34. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
965472Sole owner license (name not shown)CLEARB General Building Contractor; C-46 Solar ContractorSep 12, 2011Sep 30, 202732

License numbers are the ones the utilities recorded on the interconnection applications (33 of 34 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 965472. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Los Angeles23
San Bernardino5
Orange4
Riverside2

Top cities

CityInstalls
Arcadia3
Rosemead3
Walnut3
Alta Loma2
Monterey Park2
Westminster2
Chino1
Claremont1
Diamond Bar1
Duarte1
El Monte1
Highland1
Lancaster1
Murrieta1
Orange1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
AZ SOLAR26
AZ Solar8

Common questions

Where does AZ Solar install solar?

Its installs are spread across 4 counties. The most are in Los Angeles County (23 installs), followed by San Bernardino County (5).

How often does AZ Solar install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 2).

How many AZ Solar installs are under NEM 3.0 (the Net Billing Tariff)?

2 of its 34 interconnected installs (5.9% of the 34 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.