Bella Construction has 145 residential solar installs interconnected in California, active in the records from 2015 through 2019 (Dec 12, 2015 to Nov 5, 2019), most of them in Fresno County (95), Madera County (20) and Los Angeles County (18). CSLB lists license 888367 (BELLA) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Apr 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
145
Last 24 months
0
Total capacity
1,259.5 kW DC
Median system size
8 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 145 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Dec 12, 2015
Latest install
Nov 5, 2019
Counties
8
Utilities
PGE 123, SCE 22
CSLB license
888367

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
201510
2016110
2017520
2018470
2019340
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 145 interconnected installs with a tariff recorded (145) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.03020.7%not counted
NEM 2.011579.3%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Bella Construction’s installs. No residential system in the file lists a third-party owner name that matches Bella Construction exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 145 of Bella Construction’s 145 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (55, 37.9%) used modules recorded as Canadian Solar.

Across all years, 145 of Bella Construction’s 145 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (133, 91.7%) used inverters recorded as SolarEdge.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar055
Qcells042
SolarWorld017
Axitec014
LG08
Inverter makerSolarEdge0133
Enphase011
LG01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 145 of 145 installs, inverters on 145. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Bella Construction as developer on 0 battery storage projects and as installer on 1 (0 name it as both), 1 projects in all with 17 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Feb 25, 2021 to Feb 25, 2021.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled117$16,808

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency117$16,8080$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
888367BELLA (Corporation)CLEAR, FAM Sup Tmp LicB General Building Contractor; C-10 Electrical ContractorDec 14, 2006Apr 30, 2028143

License numbers are the ones the utilities recorded on the interconnection applications (145 of 145 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

CSLB’s License Master file lists a disciplinary bond on license 888367 (bond reason recorded: Issuance), required Apr 23, 2018, $15,000, CSLB case number 2015000503, bond cancelled Mar 21, 2022. CSLB lists license 888367 under the business name BELLA; the bond is on the license, as CSLB records it. Current CSLB record: 888367.

What a disciplinary bond is: CSLB’s Bond Basics page says that when a license has been revoked, or in some instances suspended, for a violation of the Contractors State License Law, the contractor must file a disciplinary bond with the Registrar to reinstate, reissue or reapply for a license, and that the bond must stay on file for at least two years (CSLB Bond Basics). The file gives one disciplinary bond entry per license and does not say which of those circumstances applied, what the case was about or how it ended. CSLB’s license detail page shows any public disciplinary action.

Local solar permits naming its license

Solar permits in city and county open data that list Bella Construction’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2021Total
City and County of San Francisco88836711

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Fresno95
Madera20
Los Angeles18
Merced4
Tulare4
Kern2
San Bernardino1
Santa Clara1

Top cities

CityInstalls
Fresno45
Clovis20
Madera20
Lancaster8
Kerman7
Palmdale6
Coalinga4
Firebaugh4
Reedley4
Sanger4
Kingsburg3
Visalia3
Atwater2
Bakersfield2
Beverly Hills1

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Bella Construction133
BELLA CONSTRUCTION9
Bella construction2
bella construction1

Common questions

Where does Bella Construction install solar?

Its installs are spread across 8 counties. The most are in Fresno County (95 installs), followed by Madera County (20).

How often does Bella Construction install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Bella Construction installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 145 interconnected installs with a tariff recorded (145) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.