BELLA

How many solar installs has BELLA done in California, and which license number is on its installs?

BELLA has 168 residential solar installs interconnected in California, active in the records from 2020 through 2026 (Nov 18, 2020 to Aug 25, 2026), most of them in Fresno County (57), San Bernardino County (28) and Riverside County (19). CSLB lists license 888367 (BELLA) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Apr 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to BELLA here carry more than one CSLB license number: 888367 on 158 (CSLB holder BELLA, Ramona) and 1095618 on 10 (CSLB holder BELLA ELECTRIC, Ramona), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
168
Last 24 months
80
Total capacity
1,376.2 kW DC
Median system size
7.2 kW DC
With battery storage
50.3% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 100.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
3.0% of 168 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
39 installs, latest Aug 25, 2026
Ownership types recorded
PPA 3, other 2
Median battery size
13.5 kWh (82 installs list a capacity)
First install
Nov 18, 2020
Latest install
Aug 25, 2026
Counties
20
Utilities
PGE 85, SCE 80, SDGE 3
CSLB license
888367, 1095618

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2020 to 2026

YearInstalls interconnectedWith battery storage
202050
2021553
2022190
202390
202400
202555
2026 (through Aug 31, 2026)7575

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

39 of its 168 interconnected installs (23.2% of the 168 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The latest Net Billing Tariff install was approved Aug 25, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.010.6%not counted
NEM 2.012876.2%43 (34.4%)
Net Billing Tariff3923.2%39 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 5 of BELLA’s installs the utility recorded a third-party ownership type: PPA 3, lease 0, prepaid lease 0, other 2. Across all installers, 1 residential systems list a third-party owner name that matches BELLA exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
GPC2
ARJAN JOHL1
Bella1
hdm capital llc1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 80 of BELLA’s 80 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (23, 28.7%) used modules recorded as SEG Solar.

In the last 24 months, 80 of BELLA’s 80 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (28, 35.0%) used inverters recorded as Tesla.

In the last 24 months, 60 of BELLA’s 80 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (59, 98.3%) used batteries recorded as Tesla.

61 of 83 battery-paired PG&E and SCE installs (73.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSEG Solar2323
Qcells1545
NINGBO DEYE ESS Technology CO., LTD1414
Canadian Solar830
JA Solar7not in top list
Inverter makerTesla2828
SolarEdge2698
Enphase2536
NeoVolta Inc.66
SunPower44
Battery makerTesla5959
FranklinWH11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 160 of 168 installs, inverters on 168. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names BELLA as developer on 0 battery storage projects and as installer on 1 (0 name it as both), 1 projects in all with 17 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Sep 8, 2021 to Sep 8, 2021.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled117$16,808

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency117$16,8080$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
888367BELLA (Corporation)CLEAR, FAM Sup Tmp LicB General Building Contractor; C-10 Electrical ContractorDec 14, 2006Apr 30, 2028158
1095618BELLA ELECTRIC (Partnership)CLEAR, Pending Case/CIT| FAM Sup Tmp LicB General Building Contractor; C-10 Electrical Contractor; D-38Aug 22, 2022Aug 31, 202810

License numbers are the ones the utilities recorded on the interconnection applications (168 of 168 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

CSLB’s License Master file lists a disciplinary bond on license 888367 (bond reason recorded: Issuance), required Apr 23, 2018, $15,000, CSLB case number 2015000503, bond cancelled Mar 21, 2022. CSLB lists license 888367 under the business name BELLA; the bond is on the license, as CSLB records it. Current CSLB record: 888367.

What a disciplinary bond is: CSLB’s Bond Basics page says that when a license has been revoked, or in some instances suspended, for a violation of the Contractors State License Law, the contractor must file a disciplinary bond with the Registrar to reinstate, reissue or reapply for a license, and that the bond must stay on file for at least two years (CSLB Bond Basics). The file gives one disciplinary bond entry per license and does not say which of those circumstances applied, what the case was about or how it ended. CSLB’s license detail page shows any public disciplinary action.

Local solar permits naming its license

Solar permits in city and county open data that list BELLA’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2021Total
City and County of San Francisco88836711

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Fresno57
San Bernardino28
Riverside19
Madera13
Los Angeles12
Tulare9
Ventura8
Kings4
San Diego3
Sonoma3
Kern2
Merced2
Alameda1
Contra Costa1
El Dorado1
Mariposa1
Nevada1
Orange1
San Joaquin1
Santa Barbara1

Top cities

CityInstalls
Fresno30
Madera12
Fontana7
Clovis6
Coalinga5
Apple Valley4
Kerman4
Victorville4
Hemet3
Hesperia3
Moreno Valley3
Reedley3
Selma3
Simi Valley3
Thousand Oaks3

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
BELLA165
Bella3

Common questions

Where does BELLA install solar?

Its installs are spread across 20 counties. The most are in Fresno County (57 installs), followed by San Bernardino County (28).

How often does BELLA install batteries with solar?

50.3% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (80 of 80). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many BELLA installs are under NEM 3.0 (the Net Billing Tariff)?

39 of its 168 interconnected installs (23.2% of the 168 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.