Bella Electric
How many solar installs has Bella Electric done in California, and which license number is on its installs?
Bella Electric has 303 residential solar installs interconnected in California, active in the records from 2010 through 2026 (May 26, 2010 to Jan 6, 2026), most of them in Los Angeles County (154), Fresno County (93) and Kern County (20). CSLB lists license 888367 (BELLA) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Apr 30, 2028.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 303
- Last 24 months
- 1
- Total capacity
- 1,922 kW DC
- Median system size
- 6.1 kW DC
- With battery storage
- 0.0% all time; 0.0% last 24 months
- Third-party owned
- 0.0% of 287 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 1 installs, latest Jan 6, 2026
- Ownership types recorded
- none recorded
- First install
- May 26, 2010
- Latest install
- Jan 6, 2026
- Counties
- 13
- Utilities
- SCE 188, PGE 115
- CSLB license
- 888367
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2010 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2010 | 4 | 0 |
| 2011 | 3 | 0 |
| 2012 | 0 | 0 |
| 2013 | 5 | 0 |
| 2014 | 48 | 0 |
| 2015 | 102 | 0 |
| 2016 | 127 | 0 |
| 2017 | 13 | 0 |
| 2018 | 0 | 0 |
| 2019 | 0 | 0 |
| 2020 | 0 | 0 |
| 2021 | 0 | 0 |
| 2022 | 0 | 0 |
| 2023 | 0 | 0 |
| 2024 | 0 | 0 |
| 2025 | 0 | 0 |
| 2026 (through Aug 31, 2026) | 1 | 0 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
1 of its 303 interconnected installs (0.3% of the 303 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Jan 6, 2026.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 301 | 99.3% | not counted |
| NEM 2.0 | 1 | 0.3% | 0 (0.0%) |
| Net Billing Tariff | 1 | 0.3% | 0 (0.0%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
The utilities recorded no third-party ownership type (PPA or lease) on Bella Electric’s installs. No residential system in the file lists a third-party owner name that matches Bella Electric exactly.
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 1 of Bella Electric’s 1 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used modules recorded as Qcells.
In the last 24 months, 1 of Bella Electric’s 1 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1, 100.0%) used inverters recorded as SMA.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 1 | 10 |
| Inverter maker | SMA | 1 | 20 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 282 of 303 installs, inverters on 303. See the methodology and the equipment index.
SGIP battery storage projects
The SGIP report names Bella Electric as developer on 0 battery storage projects and as installer on 8 (0 name it as both), 8 projects in all with 149 kWh of storage. 1 have the status Paid, with $28,861 in current incentive allocations. Applications were received from Nov 21, 2024 to Jul 21, 2025.
By status
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 1 | 15 | $28,861 |
| Reserved | 7 | 134 | $180,990 |
By budget category
| Budget category | Projects | Storage kWh | Current incentive | Paid projects | Paid: current incentive |
|---|---|---|---|---|---|
| Residential Solar and Storage Equity - AB 209 Non-POU | 5 | 77 | $147,460 | 1 | $28,861 |
| Residential Storage Equity | 2 | 41 | $32,391 | 0 | $0 |
| Equity Resiliency | 1 | 30 | $30,000 | 0 | $0 |
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 888367 | BELLA (Corporation) | CLEAR, FAM Sup Tmp Lic | B General Building Contractor; C-10 Electrical Contractor | Dec 14, 2006 | Apr 30, 2028 | 270 |
License numbers are the ones the utilities recorded on the interconnection applications (278 of 303 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
CSLB’s License Master file lists a disciplinary bond on license 888367 (bond reason recorded: Issuance), required Apr 23, 2018, $15,000, CSLB case number 2015000503, bond cancelled Mar 21, 2022. CSLB lists license 888367 under the business name BELLA; the bond is on the license, as CSLB records it. Current CSLB record: 888367.
What a disciplinary bond is: CSLB’s Bond Basics page says that when a license has been revoked, or in some instances suspended, for a violation of the Contractors State License Law, the contractor must file a disciplinary bond with the Registrar to reinstate, reissue or reapply for a license, and that the bond must stay on file for at least two years (CSLB Bond Basics). The file gives one disciplinary bond entry per license and does not say which of those circumstances applied, what the case was about or how it ended. CSLB’s license detail page shows any public disciplinary action.
Local solar permits naming its license
Solar permits in city and county open data that list Bella Electric’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.
| Permit data | License | 2021 | Total |
|---|---|---|---|
| City and County of San Francisco | 888367 | 1 | 1 |
Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.
Other names reported under the same license
- BELLA: 168 installs, license 888367
- Bella Construction: 145 installs, license 888367
- B C I GROUP: 48 installs, license 888367
Counties
| County | Installs |
|---|---|
| Los Angeles | 154 |
| Fresno | 93 |
| Kern | 20 |
| Madera | 11 |
| Kings | 9 |
| Tulare | 7 |
| Merced | 3 |
| Mariposa | 1 |
| Orange | 1 |
| Riverside | 1 |
| San Bernardino | 1 |
| San Mateo | 1 |
| Stanislaus | 1 |
Top cities
| City | Installs |
|---|---|
| Lancaster | 93 |
| Fresno | 57 |
| Palmdale | 35 |
| Clovis | 25 |
| Rosamond | 12 |
| Littlerock | 9 |
| Hanford | 6 |
| Sanger | 6 |
| Madera | 5 |
| Coarsegold | 4 |
| California City | 3 |
| Tulare | 3 |
| Visalia | 3 |
| Edwards | 2 |
| Kingsburg | 2 |
Names as recorded by the utilities
The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| Bella Electric | 280 |
| BELLA ELECTRIC | 21 |
| Bella electric | 1 |
| Bella Electric dba Bella Solar | 1 |
Common questions
Where does Bella Electric install solar?
Its installs are spread across 13 counties. The most are in Los Angeles County (154 installs), followed by Fresno County (93).
How often does Bella Electric install batteries with solar?
0.0% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 1).
How many Bella Electric installs are under NEM 3.0 (the Net Billing Tariff)?
1 of its 303 interconnected installs (0.3% of the 303 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
- Self-Generation Incentive Program (SGIP) program administrators: Real-Time Public Report of SGIP applications (selfgenca.com)
Records last pulled Nov 16, 2026. Every entry links to the original public record.