Belmont Energy

How many solar installs has Belmont Energy done in California, and which license number is on its installs?

Belmont Energy has 231 residential solar installs interconnected in California, active in the records from 2012 through 2026 (Jul 5, 2012 to Feb 15, 2026), most of them in Orange County (187), San Diego County (30) and Los Angeles County (9). CSLB lists license 963824 (BELMONT ENERGY INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires May 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
231
Last 24 months
10
Total capacity
1,746.3 kW DC
Median system size
6.8 kW DC
With battery storage
16.5% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 87.5% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 215 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
10 installs, latest Jan 3, 2026
Ownership types recorded
none recorded
Median battery size
13.5 kWh (17 installs list a capacity)
First install
Jul 5, 2012
Latest install
Feb 15, 2026
Counties
5
Utilities
SDGE 128, SCE 103
CSLB license
963824

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2012 to 2026

YearInstalls interconnectedWith battery storage
201240
201350
2014100
2015190
2016220
2017120
2018150
2019220
2020211
2021221
2022281
2023293
2024134
202553
2026 (through Aug 31, 2026)44

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

10 of its 231 interconnected installs (4.3% of the 231 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Jan 3, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.05925.5%not counted
NEM 2.016270.1%10 (17.2%)
Net Billing Tariff104.3%7 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Belmont Energy’s installs. No residential system in the file lists a third-party owner name that matches Belmont Energy exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 10 of Belmont Energy’s 10 installs name a module maker in the “Generator Manufacturer” fields, and most of those (6, 60.0%) used modules recorded as Qcells.

In the last 24 months, 10 of Belmont Energy’s 10 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (7, 70.0%) used inverters recorded as Enphase.

In the last 24 months, 7 of Belmont Energy’s 10 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (3, 42.9%) used batteries recorded as Enphase.

16 of 17 battery-paired PG&E and SCE installs (94.1%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells675
JA Solar2not in top list
Hyundai1not in top list
LG120
REC1not in top list
Inverter makerEnphase7158
Tesla34
SolarEdge149
Battery makerEnphase311
Tesla33
FranklinWH11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 212 of 231 installs, inverters on 231. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Belmont Energy as developer on 2 battery storage projects and as installer on 3 (2 name it as both), 3 projects in all with 60 kWh of storage. 1 have the status Paid, with $3,845 in current incentive allocations. Applications were received from Jan 22, 2020 to Nov 29, 2022.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid122$3,845
Cancelled239$5,824

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage360$9,6691$3,845

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
963824BELMONT ENERGY INC (Corporation)CLEARC-10 Electrical Contractor; C-46 Solar ContractorJul 29, 2011May 31, 2027210

License numbers are the ones the utilities recorded on the interconnection applications (211 of 231 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 963824. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Belmont Energy’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20222023Total
unincorporated San Diego County963824224

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Orange187
San Diego30
Los Angeles9
Riverside3
San Bernardino2

Top cities

CityInstalls
Mission Viejo59
San Clemente24
Laguna Niguel23
Trabuco Canyon13
Newport Beach8
Laguna Hills7
San Juan Capo7
Coto de Caza6
Dana Point6
Carlsbad5
Rancho Santa Margarita5
San Diego5
Aliso Viejo4
Oceanside4
Santa Ana4

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Belmont Energy154
BELMONT ENERGY INC50
BELMONT ENERGY26
Belmont Energy Inc.1

Common questions

Where does Belmont Energy install solar?

Its installs are spread across 5 counties. The most are in Orange County (187 installs), followed by San Diego County (30).

How often does Belmont Energy install batteries with solar?

16.5% of its interconnected solar installs include battery storage across all years, and 87.5% in the last 24 months (7 of 8). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Belmont Energy installs are under NEM 3.0 (the Net Billing Tariff)?

10 of its 231 interconnected installs (4.3% of the 231 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.