BRIGHTSUN ENERGY CA LLC

How many solar installs has BRIGHTSUN ENERGY CA LLC done in California, and which license number is on its installs?

BRIGHTSUN ENERGY CA LLC has 45 residential solar installs interconnected in California, active in the records from 2024 through 2026 (Sep 6, 2024 to May 27, 2026), most of them in Riverside County (9), Los Angeles County (7) and San Bernardino County (5). The license number recorded on most of its installs, 1114798, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
45
Last 24 months
45
Total capacity
320.2 kW DC
Median system size
6 kW DC
With battery storage
92.7% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 92.7% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 45 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
44 installs, latest May 27, 2026
Ownership types recorded
none recorded
Median battery size
5 kWh (21 installs list a capacity)
First install
Sep 6, 2024
Latest install
May 27, 2026
Counties
17
Utilities
SCE 22, PGE 19, SDGE 4
CSLB license
1114798

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2024 to 2026

YearInstalls interconnectedWith battery storage
202486
20253631
2026 (through Aug 31, 2026)11

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

44 of its 45 interconnected installs (97.8% of the 45 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 92.5% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved May 27, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.012.2%1 (100.0%)
Net Billing Tariff4497.8%37 (92.5%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on BRIGHTSUN ENERGY CA LLC’s installs. No residential system in the file lists a third-party owner name that matches BRIGHTSUN ENERGY CA LLC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 43 of BRIGHTSUN ENERGY CA LLC’s 45 installs name a module maker in the “Generator Manufacturer” fields, and most of those (32, 74.4%) used modules recorded as LONGi.

In the last 24 months, 45 of BRIGHTSUN ENERGY CA LLC’s 45 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (45, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 36 of BRIGHTSUN ENERGY CA LLC’s 45 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (36, 100.0%) used batteries recorded as Enphase.

36 of 38 battery-paired PG&E and SCE installs (94.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLONGi3232
JinkoSolar66
Qcells55
Canadian Solar33
JA Solar11
Inverter makerEnphase4545
SolarEdge33
APsystems (Altenergy Power System)11
Power-One11
SunPower11
Battery makerEnphase3636

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 43 of 45 installs, inverters on 45. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1114798Not found in the CSLB License Master file pulled Nov 4, 202645

License numbers are the ones the utilities recorded on the interconnection applications (45 of 45 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list BRIGHTSUN ENERGY CA LLC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2024Total
unincorporated San Diego County111479844

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Riverside9
Los Angeles7
San Bernardino5
Alameda4
San Diego4
Fresno3
Contra Costa2
Santa Clara2
Butte1
El Dorado1
Humboldt1
Lake1
Monterey1
Nevada1
Plumas1
Tulare1
Tuolumne1

Top cities

CityInstalls
Adelanto3
Moreno Valley3
Carson2
Clovis2
Hemet2
Oakland2
Perris2
San Jose2
Spring Valley2
Auburn1
Bloomington1
Cathedral City1
Chico1
Clearlake1
Dublin1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
BRIGHTSUN ENERGY CA LLC45

Common questions

Where does BRIGHTSUN ENERGY CA LLC install solar?

Its installs are spread across 17 counties. The most are in Riverside County (9 installs), followed by Los Angeles County (7).

How often does BRIGHTSUN ENERGY CA LLC install batteries with solar?

92.7% of its interconnected solar installs include battery storage across all years, and 92.7% in the last 24 months (38 of 41). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many BRIGHTSUN ENERGY CA LLC installs are under NEM 3.0 (the Net Billing Tariff)?

44 of its 45 interconnected installs (97.8% of the 45 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 92.5% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.