BRM Power

How many solar installs has BRM Power done in California, and which license number is on its installs?

BRM Power has 63 residential solar installs interconnected in California, active in the records from 2021 through 2025 (Oct 7, 2021 to May 27, 2025), most of them in San Diego County (62) and Orange County (1). CSLB lists license 925228 (BUILDING RESOURCE MANAGEMENT INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-46, expires Nov 30, 2026.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
63
Last 24 months
2
Total capacity
484.4 kW DC
Median system size
6.8 kW DC
With battery storage
not recorded (SDG&E files batteries as separate projects, not on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
0.0% of 63 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
3 installs, latest Feb 3, 2025
Ownership types recorded
none recorded
First install
Oct 7, 2021
Latest install
May 27, 2025
Counties
2
Utilities
SDGE 63
CSLB license
925228

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
202120
2022160
2023410
202420
202520
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

3 of its 63 interconnected installs (4.8% of the 63 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Feb 3, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.06095.2%not recorded
Net Billing Tariff34.8%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on BRM Power’s installs. No residential system in the file lists a third-party owner name that matches BRM Power exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 2 of BRM Power’s 2 installs name a module maker in the “Generator Manufacturer” fields, and most of those (2, 100.0%) used modules recorded as Qcells.

In the last 24 months, 2 of BRM Power’s 2 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (1, 50.0%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells225
Inverter makerEnphase162
Sol-Ark11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 58 of 63 installs, inverters on 63. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
925228BUILDING RESOURCE MANAGEMENT INC (Corporation)CLEARB General Building Contractor; C-46 Solar ContractorNov 21, 2008Nov 30, 202663

License numbers are the ones the utilities recorded on the interconnection applications (63 of 63 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 925228. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list BRM Power’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20222023Total
unincorporated San Diego County925228178

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego62
Orange1

Top cities

CityInstalls
San Diego21
Escondido10
Carlsbad5
Oceanside5
Chula Vista3
El Cajon3
La Mesa3
Poway2
Spring Valley2
Vista2
Cardiff1
Encinitas1
Fallbrook1
La Jolla1
National City1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
BRM Power63

Common questions

Where does BRM Power install solar?

Its installs are spread across 2 counties. The most are in San Diego County (62 installs), followed by Orange County (1).

How often does BRM Power install batteries with solar?

Battery storage is not recorded on its interconnected solar installs: SDG&E files a battery as its own project record, not on the solar record.

How many BRM Power installs are under NEM 3.0 (the Net Billing Tariff)?

3 of its 63 interconnected installs (4.8% of the 63 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.