Brower Mechanical
How many solar installs has Brower Mechanical done in California, and which license number is on its installs?
Brower Mechanical has 300 residential solar installs interconnected in California, active in the records from 2009 through 2022 (Jul 8, 2009 to Feb 17, 2022), most of them in Placer County (244), Yolo County (19) and El Dorado County (11). The license number recorded on most of its installs, 686451, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 300
- Last 24 months
- 0
- Total capacity
- 1,919.6 kW DC
- Median system size
- 5.9 kW DC
- With battery storage
- 0.0% all time; no installs in the last 24 months last 24 months
- Third-party owned
- 10.0% of 300 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 0 installs
- Ownership types recorded
- PPA 23, prepaid lease 7
- First install
- Jul 8, 2009
- Latest install
- Feb 17, 2022
- Counties
- 14
- Utilities
- PGE 300
- CSLB license
- 686451
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2009 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2009 | 1 | 0 |
| 2010 | 21 | 0 |
| 2011 | 5 | 0 |
| 2012 | 12 | 0 |
| 2013 | 7 | 0 |
| 2014 | 36 | 0 |
| 2015 | 32 | 0 |
| 2016 | 46 | 0 |
| 2017 | 38 | 0 |
| 2018 | 23 | 0 |
| 2019 | 38 | 0 |
| 2020 | 22 | 0 |
| 2021 | 18 | 0 |
| 2022 | 1 | 0 |
| 2023 | 0 | 0 |
| 2024 | 0 | 0 |
| 2025 | 0 | 0 |
| 2026 (through Aug 31, 2026) | 0 | 0 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
None of its 300 interconnected installs with a tariff recorded (300) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 161 | 53.7% | not counted |
| NEM 2.0 | 139 | 46.3% | 0 (0.0%) |
| Net Billing Tariff | 0 | 0.0% | 0 |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
On 30 of Brower Mechanical’s installs the utility recorded a third-party ownership type: PPA 23, lease 0, prepaid lease 7, other 0. Across all installers, 22 residential systems list a third-party owner name that matches Brower Mechanical exactly (after removing case, punctuation and suffixes such as Inc or LLC).
| Third-party owner named on its installs | Installs |
|---|---|
| BROWER MECHANICAL | 22 |
| BROWER SOLAR , LLC | 5 |
| brower Mechancial | 3 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
Across all years, 274 of Brower Mechanical’s 300 installs name a module maker in the “Generator Manufacturer” fields, and most of those (205, 74.8%) used modules recorded as Canadian Solar.
Across all years, 300 of Brower Mechanical’s 300 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (139, 46.3%) used inverters recorded as Enphase.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Canadian Solar | 0 | 205 |
| SolarWorld | 0 | 29 | |
| Sharp | 0 | 22 | |
| ET Solar Industry, Ltd. | 0 | 6 | |
| LG | 0 | 4 | |
| Inverter maker | Enphase | 0 | 139 |
| SolarEdge | 0 | 138 | |
| SMA | 0 | 15 | |
| Fronius | 0 | 10 | |
| CFM Equipment Distributors Inc | 0 | 7 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 274 of 300 installs, inverters on 300. See the methodology and the equipment index.
SGIP battery storage projects
The SGIP report names Brower Mechanical as developer on 19 battery storage projects and as installer on 19 (19 name it as both), 19 projects in all with 211 kWh of storage. 14 have the status Paid, with $64,647 in current incentive allocations. Applications were received from Sep 30, 2020 to Nov 24, 2025.
By status
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 14 | 165 | $64,647 |
| Reserved | 1 | 19 | $2,818 |
| Cancelled | 4 | 27 | $52,796 |
By budget category
| Budget category | Projects | Storage kWh | Current incentive | Paid projects | Paid: current incentive |
|---|---|---|---|---|---|
| Small Residential Storage | 14 | 149 | $21,076 | 11 | $16,117 |
| Equity Resiliency | 4 | 57 | $56,924 | 3 | $48,530 |
| Residential Solar and Storage Equity - AB 209 Non-POU | 1 | 5 | $42,260 | 0 | $0 |
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 686451 | Not found in the CSLB License Master file pulled Nov 4, 2026 | 255 | ||||
License numbers are the ones the utilities recorded on the interconnection applications (255 of 300 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.
Counties
| County | Installs |
|---|---|
| Placer | 244 |
| Yolo | 19 |
| El Dorado | 11 |
| Sutter | 9 |
| Nevada | 4 |
| Yuba | 3 |
| San Joaquin | 2 |
| Solano | 2 |
| Amador | 1 |
| Butte | 1 |
| Marin | 1 |
| Napa | 1 |
| Sacramento | 1 |
| Sonoma | 1 |
Top cities
| City | Installs |
|---|---|
| Rocklin | 116 |
| Lincoln | 58 |
| Auburn | 16 |
| Loomis | 16 |
| Granite Bay | 13 |
| Newcastle | 10 |
| Woodland | 9 |
| Yuba City | 6 |
| Davis | 5 |
| Penryn | 5 |
| Colfax | 4 |
| Cameron Park | 3 |
| Placerville | 3 |
| West Sacramento | 3 |
| El Dorado Hills | 2 |
Names as recorded by the utilities
The utilities recorded this installer under 10 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| Brower Mechanical | 142 |
| BROWER MECHANICAL | 63 |
| BROWER MECHANICAL INC | 52 |
| Brower Mechanical, Inc | 16 |
| Brower MEchanical | 13 |
| Brower Mechanical Inc | 9 |
| Brower Mechanical, Inc. | 2 |
| brower mechanical | 1 |
| brower Mechanical | 1 |
| Brower Mechanical LLC | 1 |
Common questions
Where does Brower Mechanical install solar?
Its installs are spread across 14 counties. The most are in Placer County (244 installs), followed by Yolo County (19).
How often does Brower Mechanical install batteries with solar?
0.0% of its interconnected solar installs include battery storage across all years.
How many Brower Mechanical installs are under NEM 3.0 (the Net Billing Tariff)?
None of its 300 interconnected installs with a tariff recorded (300) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
- Self-Generation Incentive Program (SGIP) program administrators: Real-Time Public Report of SGIP applications (selfgenca.com)
Records last pulled Nov 16, 2026. Every entry links to the original public record.