California Solar Installers

How many solar installs has California Solar Installers done in California, and which license number is on its installs?

California Solar Installers has 216 residential solar installs interconnected in California, active in the records from 2018 through 2025 (Sep 10, 2018 to Nov 18, 2025), most of them in Los Angeles County (62), San Diego County (55) and Orange County (52). CSLB lists license 1038437 (NATIONAL ENERGY INSTALLERS LLC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Dec 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
216
Last 24 months
3
Total capacity
1,696.9 kW DC
Median system size
7 kW DC
With battery storage
10.5% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
0.0% of 216 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
6 installs, latest Sep 12, 2024
Ownership types recorded
none recorded
Median battery size
10.1 kWh (15 installs list a capacity)
First install
Sep 10, 2018
Latest install
Nov 18, 2025
Counties
6
Utilities
SCE 143, SDGE 73
CSLB license
1038437

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
201810
201930
202020
202130
202212710
2023615
2024180
202510
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

6 of its 216 interconnected installs (2.8% of the 216 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Sep 12, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.021097.2%15 (10.5%)
Net Billing Tariff62.8%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on California Solar Installers’s installs. No residential system in the file lists a third-party owner name that matches California Solar Installers exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 3 of California Solar Installers’ 3 installs name a module maker in the “Generator Manufacturer” fields, and most of those (2, 66.7%) used modules recorded as Aptos Solar.

In the last 24 months, 3 of California Solar Installers’ 3 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (2, 66.7%) used inverters recorded as APsystems (Altenergy Power System).

In the last 24 months, none of California Solar Installers’ 3 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

15 of 15 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerAptos Solar28
UnitedRenewableEnergyCo.,Ltd.130
Inverter makerAPsystems (Altenergy Power System)239
Enphase187
Battery makerEnphase015

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 212 of 216 installs, inverters on 216. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names California Solar Installers as developer on 0 battery storage projects and as installer on 5 (0 name it as both), 5 projects in all with 51 kWh of storage. 2 have the status Paid, with $5,363 in current incentive allocations. Applications were received from Nov 5, 2021 to Sep 6, 2023.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid229$5,363
Cancelled322$5,866

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage448$8,3842$5,363
Equity Resiliency13$2,8450$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1038437NATIONAL ENERGY INSTALLERS LLC (Limited Liability)CLEARC-10 Electrical ContractorApr 23, 2018Dec 31, 2027216

License numbers are the ones the utilities recorded on the interconnection applications (216 of 216 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1038437. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list California Solar Installers’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense202120222023Total
unincorporated San Diego County103843711911

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles62
San Diego55
Orange52
Riverside41
San Bernardino3
Ventura3

Top cities

CityInstalls
Long Beach19
San Diego16
Canyon Lake11
Corona11
Palmdale9
Newport Beach8
Carlsbad7
Costa Mesa7
Laguna Niguel7
Compton5
Laguna Hills5
Mission Viejo5
Murrieta5
Borrego Springs4
Escondido4

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
CALIFORNIA SOLAR INSTALLERS LLC142
California Solar Installers74

Common questions

Where does California Solar Installers install solar?

Its installs are spread across 6 counties. The most are in Los Angeles County (62 installs), followed by San Diego County (55).

How often does California Solar Installers install batteries with solar?

10.5% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many California Solar Installers installs are under NEM 3.0 (the Net Billing Tariff)?

6 of its 216 interconnected installs (2.8% of the 216 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.