CalState Solar

How many solar installs has CalState Solar done in California, and which license number is on its installs?

CalState Solar has 404 residential solar installs interconnected in California, active in the records from 2014 through 2025 (Dec 17, 2014 to Jul 8, 2025), most of them in Los Angeles County (124), Riverside County (100) and San Diego County (96). The license number recorded on most of its installs, 1006247, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
404
Last 24 months
1
Total capacity
2,215.1 kW DC
Median system size
4.7 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
6.8% of 398 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
43 installs, latest Jul 8, 2024
Ownership types recorded
PPA 5, lease 21, other 1
First install
Dec 17, 2014
Latest install
Jul 8, 2025
Counties
8
Utilities
SCE 289, SDGE 112, PGE 3
CSLB license
1006247

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
201410
2015190
2016550
2017440
2018390
2019430
20201220
2021200
202260
2023410
2024130
202510
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

43 of its 404 interconnected installs (10.6% of the 404 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Jul 8, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.09523.5%not counted
NEM 2.026665.8%0 (0.0%)
Net Billing Tariff4310.6%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 27 of CalState Solar’s installs the utility recorded a third-party ownership type: PPA 5, lease 21, prepaid lease 0, other 1. No residential system in the file lists a third-party owner name that matches CalState Solar exactly.

Third-party owner named on its installsInstalls
KB homes12
Sunnova8
Clean Power Finance2
James Pearce2
Spruce2

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 1 of CalState Solar’s 1 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used modules recorded as UnitedRenewableEnergyCo.,Ltd..

In the last 24 months, 1 of CalState Solar’s 1 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1, 100.0%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerUnitedRenewableEnergyCo.,Ltd.1not in top list
Inverter makerEnphase1326

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 401 of 404 installs, inverters on 404. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names CalState Solar as developer on 9 battery storage projects and as installer on 6 (6 name it as both), 9 projects in all with 128 kWh of storage. 6 have the status Paid, with $37,499 in current incentive allocations. Applications were received from Oct 16, 2020 to Jan 18, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid688$37,499
Cancelled339$16,676

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage788$14,5755$11,099
Equity Resiliency240$39,6001$26,400

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1006247Not found in the CSLB License Master file pulled Nov 4, 2026368

License numbers are the ones the utilities recorded on the interconnection applications (369 of 404 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list CalState Solar’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192021202220232024Total
unincorporated San Diego County100624738334122

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles124
Riverside100
San Diego96
Orange42
San Bernardino38
Sonoma2
Lake1
Ventura1

Top cities

CityInstalls
Covina62
La Mesa44
El Monte33
Murrieta22
Temecula18
Santee17
Corona8
Menifee8
Lake Elsinore7
Wildomar7
San Juan Capo6
Canyon Lake5
Carlsbad5
Hemet5
Hesperia5

Names as recorded by the utilities

The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
CALSTATE SOLAR INC206
CalState Solar190
Calstate Solar3
CalState Solar, Inc.3
CalState Solar Inc.1
Calstate Solar LLC1

Common questions

Where does CalState Solar install solar?

Its installs are spread across 8 counties. The most are in Los Angeles County (124 installs), followed by Riverside County (100).

How often does CalState Solar install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many CalState Solar installs are under NEM 3.0 (the Net Billing Tariff)?

43 of its 404 interconnected installs (10.6% of the 404 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.