CAPITAL ENERGY LLC

How many solar installs has CAPITAL ENERGY LLC done in California, and which license number is on its installs?

CAPITAL ENERGY LLC has 89 residential solar installs interconnected in California, active in the records from 2025 through 2026 (Dec 31, 2025 to Aug 26, 2026), most of them in Tulare County (31), Kern County (13) and San Bernardino County (9). CSLB lists license 1142165 (CAPITAL ENERGY LLC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Aug 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
89
Last 24 months
89
Total capacity
841.9 kW DC
Median system size
8.6 kW DC
With battery storage
98.8% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 98.8% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
91.0% of 89 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
89 installs, latest Aug 26, 2026
Ownership types recorded
PPA 79, lease 2
Median battery size
13.5 kWh (72 installs list a capacity)
First install
Dec 31, 2025
Latest install
Aug 26, 2026
Counties
16
Utilities
SCE 63, PGE 20, SDGE 6
CSLB license
1142165

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2025 to 2026

YearInstalls interconnectedWith battery storage
202511
2026 (through Aug 31, 2026)8881

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

89 of its 89 interconnected installs (100.0% of the 89 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 98.8% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 26, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.000.0%0
Net Billing Tariff89100.0%82 (98.8%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 81 of CAPITAL ENERGY LLC’s installs the utility recorded a third-party ownership type: PPA 79, lease 2, prepaid lease 0, other 0. Across all installers, 3 residential systems list a third-party owner name that matches CAPITAL ENERGY LLC exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Goodleap LLC61
LightReach6
Derek Heckerdon5
Sunrun5
Capital Energy LLC3

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 89 of CAPITAL ENERGY LLC’s 89 installs name a module maker in the “Generator Manufacturer” fields, and most of those (71, 79.8%) used modules recorded as Qcells.

In the last 24 months, 89 of CAPITAL ENERGY LLC’s 89 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (88, 98.9%) used inverters recorded as Tesla.

In the last 24 months, 77 of CAPITAL ENERGY LLC’s 89 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (77, 100.0%) used batteries recorded as Tesla.

77 of 82 battery-paired PG&E and SCE installs (93.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells7171
JA Solar1111
LONGi77
Tesla11
Inverter makerTesla8888
SMA11
SolarEdge11
Battery makerTesla7777

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 89 of 89 installs, inverters on 89. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1142165CAPITAL ENERGY LLC (Limited Liability)CLEARC-10 Electrical ContractorAug 18, 2025Aug 31, 202789

License numbers are the ones the utilities recorded on the interconnection applications (89 of 89 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1142165. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list CAPITAL ENERGY LLC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2026Total
unincorporated San Diego County114216555

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Tulare31
Kern13
San Bernardino9
Fresno7
Kings5
Riverside5
San Diego4
Los Angeles3
San Joaquin3
Orange2
San Mateo2
Merced1
Monterey1
Nevada1
Sutter1
Yuba1

Top cities

CityInstalls
Porterville16
Tehachapi12
Visalia10
Fresno5
Apple Valley2
Desert Hot Springs2
Fontana2
Hanford2
Lemoore2
Poway2
Agoura Hills1
Armona1
Bakersfield1
Burlingame1
Exeter1

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
CAPITAL ENERGY LLC82
Capital Energy LLC6
Capital Energy1

Common questions

Where does CAPITAL ENERGY LLC install solar?

Its installs are spread across 16 counties. The most are in Tulare County (31 installs), followed by Kern County (13).

How often does CAPITAL ENERGY LLC install batteries with solar?

98.8% of its interconnected solar installs include battery storage across all years, and 98.8% in the last 24 months (82 of 83). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many CAPITAL ENERGY LLC installs are under NEM 3.0 (the Net Billing Tariff)?

89 of its 89 interconnected installs (100.0% of the 89 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 98.8% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.