Centerline Construction Management

How many solar installs has Centerline Construction Management done in California, and which license number is on its installs?

Centerline Construction Management has 48 residential solar installs interconnected in California, active in the records from 2010 through 2018 (Aug 3, 2010 to Dec 6, 2018), most of them in Los Angeles County (19), Ventura County (15) and San Bernardino County (5). The license number recorded on most of its installs, 292923, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
48
Last 24 months
0
Total capacity
328.4 kW DC
Median system size
6.6 kW DC
With battery storage
2.1% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
2.1% of 48 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
other 1
Median battery size
9.8 kWh (1 installs list a capacity)
First install
Aug 3, 2010
Latest install
Dec 6, 2018
Counties
8
Utilities
SCE 43, PGE 4, SDGE 1
CSLB license
292923

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2010 to 2026

YearInstalls interconnectedWith battery storage
201010
201100
201220
201320
201400
201500
201680
2017260
201891
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 48 interconnected installs with a tariff recorded (48) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.02858.3%not counted
NEM 2.02041.7%1 (5.3%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 1 of Centerline Construction Management’s installs the utility recorded a third-party ownership type: PPA 0, lease 0, prepaid lease 0, other 1. No residential system in the file lists a third-party owner name that matches Centerline Construction Management exactly.

Third-party owner named on its installsInstalls
WCC Energy1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 43 of Centerline Construction Management’s 48 installs name a module maker in the “Generator Manufacturer” fields, and most of those (34, 79.1%) used modules recorded as Qcells.

Across all years, 48 of Centerline Construction Management’s 48 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (38, 79.2%) used inverters recorded as SolarEdge.

Across all years, 1 of Centerline Construction Management’s 48 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as LG.

1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells034
LG05
SolarWorld04
Inverter makerSolarEdge038
Enphase04
SMA04
Fronius02
Battery makerLG01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 43 of 48 installs, inverters on 48. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Centerline Construction Management as developer on 0 battery storage projects and as installer on 3 (0 name it as both), 3 projects in all with 25 kWh of storage. 3 have the status Paid, with $10,073 in current incentive allocations. Applications were received from Oct 5, 2017 to Nov 23, 2017.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid325$10,073

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage325$10,0733$10,073

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
292923Not found in the CSLB License Master file pulled Nov 4, 202648

License numbers are the ones the utilities recorded on the interconnection applications (48 of 48 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Los Angeles19
Ventura15
San Bernardino5
Orange3
Santa Clara3
Kern1
Riverside1
San Diego1

Top cities

CityInstalls
Simi Valley8
Chino Hills3
Moorpark3
San Jose3
Thousand Oaks3
Walnut3
Diamond Bar2
Pomona2
Santa Clarita2
Valencia2
Bakersfield1
Brea1
Chatsworth1
Chino1
Compton1

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Centerline Construction Management38
Centerline Construction Management CO.6
Centerline Construction Management CO3
CENTERLINE CONSTRUCTION MANAGEMENT CO1

Common questions

Where does Centerline Construction Management install solar?

Its installs are spread across 8 counties. The most are in Los Angeles County (19 installs), followed by Ventura County (15).

How often does Centerline Construction Management install batteries with solar?

2.1% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Centerline Construction Management installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 48 interconnected installs with a tariff recorded (48) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.