CROWN SOLAR ELECTRIC INC

How many solar installs has CROWN SOLAR ELECTRIC INC done in California, and which license number is on its installs?

CROWN SOLAR ELECTRIC INC has 300 residential solar installs interconnected in California, active in the records from 2016 through 2024 (Sep 26, 2016 to Oct 21, 2024), most of them in Ventura County (174), Los Angeles County (76) and Riverside County (19). The license number recorded on most of its installs, 1014425, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
300
Last 24 months
1
Total capacity
2,470.2 kW DC
Median system size
7.7 kW DC
With battery storage
9.7% all time; 0.0% last 24 months
Third-party owned
0.0% of 300 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
Median battery size
20.2 kWh (29 installs list a capacity)
First install
Sep 26, 2016
Latest install
Oct 21, 2024
Counties
7
Utilities
SCE 300
CSLB license
1014425

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
201640
201740
2018270
2019470
2020410
2021335
202210115
2023397
202442
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 300 interconnected installs with a tariff recorded (300) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.072.3%not counted
NEM 2.029397.7%28 (9.6%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on CROWN SOLAR ELECTRIC INC’s installs. No residential system in the file lists a third-party owner name that matches CROWN SOLAR ELECTRIC INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 1 of CROWN SOLAR ELECTRIC INC’s 1 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used modules recorded as Silfab.

In the last 24 months, 1 of CROWN SOLAR ELECTRIC INC’s 1 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1, 100.0%) used inverters recorded as Enphase.

In the last 24 months, none of CROWN SOLAR ELECTRIC INC’s 1 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

24 of 29 battery-paired PG&E and SCE installs (82.8%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSilfab17
Inverter makerEnphase1173
Battery makerEnphase023
LG01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 276 of 300 installs, inverters on 300. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names CROWN SOLAR ELECTRIC INC as developer on 30 battery storage projects and as installer on 30 (30 name it as both), 30 projects in all with 621 kWh of storage. 19 have the status Paid, with $167,358 in current incentive allocations. Applications were received from Jul 10, 2020 to Apr 6, 2023.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid19395$167,358
Cancelled11227$114,181

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage17266$44,43811$32,559
Equity Resiliency9220$210,1345$113,074
Large-Scale Storage4136$26,9673$21,726

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1014425Not found in the CSLB License Master file pulled Nov 4, 2026299

License numbers are the ones the utilities recorded on the interconnection applications (300 of 300 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Ventura174
Los Angeles76
Riverside19
San Bernardino14
Orange8
Santa Barbara7
Kern2

Top cities

CityInstalls
Thousand Oaks39
Newbury Park31
Simi Valley28
Camarillo22
Westlake Village17
Moorpark16
Ventura16
Corona11
Oxnard10
Canyon Country9
Agoura Hills8
Santa Barbara7
Oak Park6
Valencia6
Lancaster4

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
CROWN SOLAR ELECTRIC INC293
Crown Solar Electric7

Common questions

Where does CROWN SOLAR ELECTRIC INC install solar?

Its installs are spread across 7 counties. The most are in Ventura County (174 installs), followed by Los Angeles County (76).

How often does CROWN SOLAR ELECTRIC INC install batteries with solar?

9.7% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 1).

How many CROWN SOLAR ELECTRIC INC installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 300 interconnected installs with a tariff recorded (300) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.