CSR Electric Inc.

How many solar installs has CSR Electric Inc. done in California, and which license number is on its installs?

CSR Electric Inc. has 76 residential solar installs interconnected in California, active in the records from 2014 through 2022 (Jul 14, 2014 to Feb 4, 2022), most of them in Kern County (46), Los Angeles County (7) and Kings County (4). The license number recorded on most of its installs, 774660, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
76
Last 24 months
0
Total capacity
360.6 kW DC
Median system size
4.3 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 71 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Jul 14, 2014
Latest install
Feb 4, 2022
Counties
11
Utilities
PGE 51, SCE 25
CSLB license
774660

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
201450
201510
201660
2017440
201880
201920
202020
202170
202210
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 76 interconnected installs with a tariff recorded (76) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.01925.0%not counted
NEM 2.05775.0%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on CSR Electric Inc.’s installs. No residential system in the file lists a third-party owner name that matches CSR Electric Inc. exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 70 of CSR Electric Inc.’s 76 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (29, 41.4%) used modules recorded as Hyundai.

Across all years, 76 of CSR Electric Inc.’s 76 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (62, 81.6%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerHyundai029
Canadian Solar014
REC07
Auxin Solar06
Qcells06
Inverter makerEnphase062
SolarEdge010
SMA03
ABB01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 70 of 76 installs, inverters on 76. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
774660Not found in the CSLB License Master file pulled Nov 4, 202663

License numbers are the ones the utilities recorded on the interconnection applications (72 of 76 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Kern46
Los Angeles7
Kings4
San Bernardino4
Tulare4
Fresno3
Riverside3
Orange2
Contra Costa1
Santa Clara1
Stanislaus1

Top cities

CityInstalls
Bakersfield32
Arvin3
Avenal3
Porterville3
Wasco3
California City2
Lamont2
Long Beach2
Norco2
San Bernardino2
South Gate2
Yorba Linda2
Campbell1
Discovery Bay1
Fresno1

Names as recorded by the utilities

The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
CSR ELECTRIC35
csr electric19
CSR Electric Inc.10
CSR Electric8
CSR ELECTRIC INC.3
CSR electric1

Common questions

Where does CSR Electric Inc. install solar?

Its installs are spread across 11 counties. The most are in Kern County (46 installs), followed by Los Angeles County (7).

How often does CSR Electric Inc. install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many CSR Electric Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 76 interconnected installs with a tariff recorded (76) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.