Demers Construction

How many solar installs has Demers Construction done in California, and which license number is on its installs?

Demers Construction has 96 residential solar installs interconnected in California, active in the records from 2016 through 2025 (Oct 20, 2016 to Dec 10, 2025), most of them in Fresno County (47), Madera County (38) and Mariposa County (4). CSLB lists license 752654 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Aug 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
96
Last 24 months
8
Total capacity
709.4 kW DC
Median system size
6.7 kW DC
With battery storage
7.3% all time; 75.0% last 24 months
Third-party owned
0.0% of 96 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
9 installs, latest Dec 10, 2025
Ownership types recorded
none recorded
Median battery size
10 kWh (7 installs list a capacity)
First install
Oct 20, 2016
Latest install
Dec 10, 2025
Counties
7
Utilities
PGE 92, SCE 4
CSLB license
752654

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
201650
2017260
2018200
2019270
202010
202100
202210
202370
202432
202565
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

9 of its 96 interconnected installs (9.4% of the 96 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 77.8% of those include battery storage. The latest Net Billing Tariff install was approved Dec 10, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.088.3%not counted
NEM 2.07982.3%0 (0.0%)
Net Billing Tariff99.4%7 (77.8%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Demers Construction’s installs. No residential system in the file lists a third-party owner name that matches Demers Construction exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 8 of Demers Construction’s 8 installs name a module maker in the “Generator Manufacturer” fields, and most of those (7, 87.5%) used modules recorded as Hyundai.

In the last 24 months, 8 of Demers Construction’s 8 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (8, 100.0%) used inverters recorded as SolarEdge.

In the last 24 months, 6 of Demers Construction’s 8 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (6, 100.0%) used batteries recorded as SolarEdge.

7 of 7 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerHyundai77
Trina Solar1not in top list
Inverter makerSolarEdge895
Battery makerSolarEdge67

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 96 of 96 installs, inverters on 96. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
752654Sole owner license (name not shown)CLEARB General Building ContractorAug 5, 1998Aug 31, 202896

License numbers are the ones the utilities recorded on the interconnection applications (96 of 96 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 752654. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Fresno47
Madera38
Mariposa4
Tulare3
Kings2
Orange1
Santa Cruz1

Top cities

CityInstalls
Fresno22
Oakhurst15
Clovis8
Madera8
Coarsegold6
Sanger5
Ahwahnee4
Mariposa4
Kerman3
North Fork3
Selma3
Caruthers2
Lemoore2
Visalia2
Auberry1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Demers Construction73
DEMERS CONSTRUCTION23

Common questions

Where does Demers Construction install solar?

Its installs are spread across 7 counties. The most are in Fresno County (47 installs), followed by Madera County (38).

How often does Demers Construction install batteries with solar?

7.3% of its interconnected solar installs include battery storage across all years, and 75.0% in the last 24 months (6 of 8).

How many Demers Construction installs are under NEM 3.0 (the Net Billing Tariff)?

9 of its 96 interconnected installs (9.4% of the 96 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 77.8% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.