DIRT WORK & EXCAVATION INC

How many solar installs has DIRT WORK & EXCAVATION INC done in California, and which license number is on its installs?

DIRT WORK & EXCAVATION INC has 49 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Jan 11, 2019 to Mar 12, 2026), most of them in San Bernardino County (33), Los Angeles County (6) and Orange County (5). The license number recorded on most of its installs, 922368, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
49
Last 24 months
36
Total capacity
435.3 kW DC
Median system size
8 kW DC
With battery storage
57.1% all time; 77.8% last 24 months
Third-party owned
0.0% of 49 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
34 installs, latest Dec 17, 2025
Ownership types recorded
none recorded
Median battery size
10 kWh (28 installs list a capacity)
First install
Jan 11, 2019
Latest install
Mar 12, 2026
Counties
5
Utilities
SCE 49
CSLB license
922368

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
201910
202000
202100
202220
202330
202470
20253528
2026 (through Aug 31, 2026)10

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

34 of its 49 interconnected installs (69.4% of the 49 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 82.4% of those include battery storage. The latest Net Billing Tariff install was approved Dec 17, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.01530.6%0 (0.0%)
Net Billing Tariff3469.4%28 (82.4%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on DIRT WORK & EXCAVATION INC’s installs. No residential system in the file lists a third-party owner name that matches DIRT WORK & EXCAVATION INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 36 of DIRT WORK & EXCAVATION INC’s 36 installs name a module maker in the “Generator Manufacturer” fields, and most of those (20, 55.6%) used modules recorded as LONGi.

In the last 24 months, 36 of DIRT WORK & EXCAVATION INC’s 36 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (36, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 28 of DIRT WORK & EXCAVATION INC’s 36 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (27, 96.4%) used batteries recorded as Enphase.

28 of 28 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLONGi2020
JA Solar1010
Canadian Solar33
United Renewable Energy212
REC1not in top list
Inverter makerEnphase3643
Battery makerEnphase2727
FranklinWH11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 49 of 49 installs, inverters on 49. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
922368Not found in the CSLB License Master file pulled Nov 4, 202649

License numbers are the ones the utilities recorded on the interconnection applications (49 of 49 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
San Bernardino33
Los Angeles6
Orange5
Riverside4
Ventura1

Top cities

CityInstalls
Yucaipa8
Apple Valley6
Hesperia6
Pinon Hills3
Barstow2
Huntington Beach2
Long Beach2
Lucerne Valley2
Redlands2
Alta Loma1
Beaumont1
Costa Mesa1
Garden Grove1
Highland1
La Verne1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
DIRT WORK & EXCAVATION INC48
Dirt Work and Excavation1

Common questions

Where does DIRT WORK & EXCAVATION INC install solar?

Its installs are spread across 5 counties. The most are in San Bernardino County (33 installs), followed by Los Angeles County (6).

How often does DIRT WORK & EXCAVATION INC install batteries with solar?

57.1% of its interconnected solar installs include battery storage across all years, and 77.8% in the last 24 months (28 of 36).

How many DIRT WORK & EXCAVATION INC installs are under NEM 3.0 (the Net Billing Tariff)?

34 of its 49 interconnected installs (69.4% of the 49 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 82.4% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.