Ecology Electrical & Development Inc.

How many solar installs has Ecology Electrical & Development Inc. done in California, and which license number is on its installs?

Ecology Electrical & Development Inc. has 68 residential solar installs interconnected in California, active in the records from 2013 through 2021 (Oct 25, 2013 to Jan 11, 2021), most of them in Los Angeles County (33), Orange County (17) and San Diego County (12). CSLB lists license 985876 (ECOLOGY ELECTRICAL) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Aug 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
68
Last 24 months
0
Total capacity
334.1 kW DC
Median system size
4.4 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
2.9% of 68 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
other 2
First install
Oct 25, 2013
Latest install
Jan 11, 2021
Counties
6
Utilities
SCE 55, SDGE 13
CSLB license
985876

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2013 to 2026

YearInstalls interconnectedWith battery storage
201340
201400
2015110
2016440
201760
201800
201900
202020
202110
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 68 interconnected installs with a tariff recorded (68) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.05479.4%not counted
NEM 2.01420.6%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 2 of Ecology Electrical & Development Inc.’s installs the utility recorded a third-party ownership type: PPA 0, lease 0, prepaid lease 0, other 2. No residential system in the file lists a third-party owner name that matches Ecology Electrical & Development Inc. exactly.

Third-party owner named on its installsInstalls
Caty Rojas1
Holden, Jerry & Barbara1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 64 of Ecology Electrical & Development Inc.’s 68 installs name a module maker in the “Generator Manufacturer” fields, and most of those (57, 89.1%) used modules recorded as SolarWorld.

Across all years, 68 of Ecology Electrical & Development Inc.’s 68 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (52, 76.5%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSolarWorld057
Canadian Solar04
Hyundai03
Inverter makerEnphase052
SMA08
Power-One02
SolarEdge02
ABB01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 64 of 68 installs, inverters on 68. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
985876ECOLOGY ELECTRICAL (Corporation)CLEARC-10 Electrical ContractorAug 6, 2013Aug 31, 202764

License numbers are the ones the utilities recorded on the interconnection applications (64 of 68 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 985876. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Los Angeles33
Orange17
San Diego12
San Bernardino3
Ventura2
Riverside1

Top cities

CityInstalls
Whittier6
Garden Grove5
La Mesa4
Long Beach4
Santa Ana4
Lakewood3
San Diego3
Bellflower2
Brea2
Buena Park2
Chula Vista2
Compton2
Pico Rivera2
Canyon Country1
Covina1

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Ecology Electrical & Development Inc.43
Ecology Electrical & Development13
ECOLOGY ELECTRICAL AND DEVELOPMENT INC5
ECOLOGY ELECTRICAL AND DEVELOPMENT INC dba ECOLOGY ELECTRICAL4
Ecology Electrical and Development Inc.3

Common questions

Where does Ecology Electrical & Development Inc. install solar?

Its installs are spread across 6 counties. The most are in Los Angeles County (33 installs), followed by Orange County (17).

How often does Ecology Electrical & Development Inc. install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Ecology Electrical & Development Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 68 interconnected installs with a tariff recorded (68) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources