ENPOWER STAR LLC
How many solar installs has ENPOWER STAR LLC done in California, and which license number is on its installs?
ENPOWER STAR LLC has 139 residential solar installs interconnected in California, active in the records from 2023 through 2026 (Jan 17, 2023 to Aug 26, 2026), most of them in Los Angeles County (77), San Bernardino County (18) and Riverside County (17). CSLB lists license 1112396 (ENPOWER STAR LLC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications A, C-10, expires Nov 30, 2027.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
The installs credited to ENPOWER STAR LLC here carry more than one CSLB license number: 1112396 on 108 (CSLB holder ENPOWER STAR LLC, Chatsworth) and 1089807 on 31 (CSLB holder ENPOWER STAR, Woodland Hills), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.
- Interconnected installs
- 139
- Last 24 months
- 108
- Total capacity
- 1,134.7 kW DC
- Median system size
- 7.2 kW DC
- With battery storage
- 83.3% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 93.5% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
- Third-party owned
- 6.5% of 139 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 127 installs, latest Aug 26, 2026
- Ownership types recorded
- PPA 7, lease 2
- Median battery size
- 13.5 kWh (110 installs list a capacity)
- First install
- Jan 17, 2023
- Latest install
- Aug 26, 2026
- Counties
- 12
- Utilities
- SCE 133, PGE 5, SDGE 1
- CSLB license
- 1112396, 1089807
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2023 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2023 | 15 | 3 |
| 2024 | 26 | 19 |
| 2025 | 62 | 58 |
| 2026 (through Aug 31, 2026) | 36 | 35 |
The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
127 of its 139 interconnected installs (91.4% of the 139 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 88.9% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 26, 2026.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 1 | 0.7% | not counted |
| NEM 2.0 | 11 | 7.9% | 2 (18.2%) |
| Net Billing Tariff | 127 | 91.4% | 112 (88.9%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.
Leases, PPAs and third-party owners
On 9 of ENPOWER STAR LLC’s installs the utility recorded a third-party ownership type: PPA 7, lease 2, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches ENPOWER STAR LLC exactly.
| Third-party owner named on its installs | Installs |
|---|---|
| Hdm | 2 |
| LightReach | 2 |
| Everbright | 1 |
| Everbright Financial | 1 |
| Goodleap | 1 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 107 of ENPOWER STAR LLC’s 108 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (38, 35.5%) used modules recorded as VSUN (Vietnam Sunergy).
In the last 24 months, 108 of ENPOWER STAR LLC’s 108 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (27, 25.0%) used inverters recorded as EG4.
In the last 24 months, 67 of ENPOWER STAR LLC’s 108 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (30, 44.8%) used batteries recorded as Tesla.
71 of 115 battery-paired PG&E and SCE installs (61.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | VSUN (Vietnam Sunergy) | 38 | 50 |
| Canadian Solar | 27 | 37 | |
| EG4 | 25 | 25 | |
| Hyundai | 18 | 18 | |
| Qcells | 12 | 17 | |
| Inverter maker | EG4 | 27 | 27 |
| Tesla | 25 | 25 | |
| Enphase | 20 | 35 | |
| Shenzhen Eternalplanet Energy Pingshan Ltd. | 8 | not in top list | |
| Shenzhen Eternalplanet Energy | 7 | not in top list | |
| Battery maker | Tesla | 30 | 31 |
| SHENZHEN ETERNALPLANET | 16 | 16 | |
| Enphase | 11 | 14 | |
| Shenzhen Eternalplanet Energy | 4 | 4 | |
| Fox ESS | 2 | 2 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 138 of 139 installs, inverters on 139. See the methodology and the equipment index.
SGIP battery storage projects
The SGIP report names ENPOWER STAR LLC as developer on 21 battery storage projects and as installer on 20 (20 name it as both), 21 projects in all with 6,496 kWh of storage. 1 have the status Paid, with $2,586 in current incentive allocations. Applications were received from May 22, 2024 to Jan 5, 2026.
By status
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 1 | 17 | $2,586 |
| Reserved | 7 | 6,288 | $853,953 |
| Pending Reservation | 9 | 124 | $232,852 |
| Waitlist | 1 | 14 | $30,104 |
| Cancelled | 3 | 52 | $25,054 |
By budget category
| Budget category | Projects | Storage kWh | Current incentive | Paid projects | Paid: current incentive |
|---|---|---|---|---|---|
| Residential Solar and Storage Equity - AB 209 Non-POU | 14 | 194 | $451,430 | 0 | $0 |
| Small Residential Storage | 4 | 66 | $9,910 | 1 | $2,586 |
| Large-Scale Storage | 2 | 6,219 | $665,771 | 0 | $0 |
| Equity Resiliency | 1 | 17 | $17,438 | 0 | $0 |
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 1112396 | ENPOWER STAR LLC (Limited Liability) | CLEAR | A General Engineering Contractor; C-10 Electrical Contractor | Nov 7, 2023 | Nov 30, 2027 | 108 |
| 1089807 | ENPOWER STAR (Corporation) | CLEAR | B General Building Contractor; C-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor | Apr 11, 2022 | Apr 30, 2028 | 31 |
License numbers are the ones the utilities recorded on the interconnection applications (139 of 139 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for licenses 1112396, 1089807. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Counties
| County | Installs |
|---|---|
| Los Angeles | 77 |
| San Bernardino | 18 |
| Riverside | 17 |
| Ventura | 15 |
| Orange | 4 |
| Kern | 2 |
| Alameda | 1 |
| Fresno | 1 |
| Napa | 1 |
| San Diego | 1 |
| San Joaquin | 1 |
| San Luis Obispo | 1 |
Top cities
| City | Installs |
|---|---|
| Palmdale | 28 |
| Simi Valley | 11 |
| Moreno Valley | 10 |
| Lancaster | 9 |
| San Bernardino | 8 |
| Calabasas | 6 |
| Perris | 4 |
| Agoura Hills | 3 |
| Littlerock | 3 |
| Rancho Palos Verdes | 3 |
| Castaic | 2 |
| Fontana | 2 |
| Lake Arrowhead | 2 |
| Long Beach | 2 |
| Newbury Park | 2 |
Names as recorded by the utilities
The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| ENPOWER STAR LLC | 107 |
| ENPOWER STAR | 31 |
| Enpower Star | 1 |
Common questions
Where does ENPOWER STAR LLC install solar?
Its installs are spread across 12 counties. The most are in Los Angeles County (77 installs), followed by San Bernardino County (18).
How often does ENPOWER STAR LLC install batteries with solar?
83.3% of its interconnected solar installs include battery storage across all years, and 93.5% in the last 24 months (100 of 107). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.
How many ENPOWER STAR LLC installs are under NEM 3.0 (the Net Billing Tariff)?
127 of its 139 interconnected installs (91.4% of the 139 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 88.9% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
- Self-Generation Incentive Program (SGIP) program administrators: Real-Time Public Report of SGIP applications (selfgenca.com)
Records last pulled Nov 16, 2026. Every entry links to the original public record.