ENPOWER STAR LLC

How many solar installs has ENPOWER STAR LLC done in California, and which license number is on its installs?

ENPOWER STAR LLC has 139 residential solar installs interconnected in California, active in the records from 2023 through 2026 (Jan 17, 2023 to Aug 26, 2026), most of them in Los Angeles County (77), San Bernardino County (18) and Riverside County (17). CSLB lists license 1112396 (ENPOWER STAR LLC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications A, C-10, expires Nov 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to ENPOWER STAR LLC here carry more than one CSLB license number: 1112396 on 108 (CSLB holder ENPOWER STAR LLC, Chatsworth) and 1089807 on 31 (CSLB holder ENPOWER STAR, Woodland Hills), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
139
Last 24 months
108
Total capacity
1,134.7 kW DC
Median system size
7.2 kW DC
With battery storage
83.3% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 93.5% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
6.5% of 139 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
127 installs, latest Aug 26, 2026
Ownership types recorded
PPA 7, lease 2
Median battery size
13.5 kWh (110 installs list a capacity)
First install
Jan 17, 2023
Latest install
Aug 26, 2026
Counties
12
Utilities
SCE 133, PGE 5, SDGE 1
CSLB license
1112396, 1089807

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2023 to 2026

YearInstalls interconnectedWith battery storage
2023153
20242619
20256258
2026 (through Aug 31, 2026)3635

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

127 of its 139 interconnected installs (91.4% of the 139 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 88.9% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 26, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.010.7%not counted
NEM 2.0117.9%2 (18.2%)
Net Billing Tariff12791.4%112 (88.9%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 9 of ENPOWER STAR LLC’s installs the utility recorded a third-party ownership type: PPA 7, lease 2, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches ENPOWER STAR LLC exactly.

Third-party owner named on its installsInstalls
Hdm2
LightReach2
Everbright1
Everbright Financial1
Goodleap1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 107 of ENPOWER STAR LLC’s 108 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (38, 35.5%) used modules recorded as VSUN (Vietnam Sunergy).

In the last 24 months, 108 of ENPOWER STAR LLC’s 108 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (27, 25.0%) used inverters recorded as EG4.

In the last 24 months, 67 of ENPOWER STAR LLC’s 108 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (30, 44.8%) used batteries recorded as Tesla.

71 of 115 battery-paired PG&E and SCE installs (61.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerVSUN (Vietnam Sunergy)3850
Canadian Solar2737
EG42525
Hyundai1818
Qcells1217
Inverter makerEG42727
Tesla2525
Enphase2035
Shenzhen Eternalplanet Energy Pingshan Ltd.8not in top list
Shenzhen Eternalplanet Energy7not in top list
Battery makerTesla3031
SHENZHEN ETERNALPLANET1616
Enphase1114
Shenzhen Eternalplanet Energy44
Fox ESS22

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 138 of 139 installs, inverters on 139. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names ENPOWER STAR LLC as developer on 21 battery storage projects and as installer on 20 (20 name it as both), 21 projects in all with 6,496 kWh of storage. 1 have the status Paid, with $2,586 in current incentive allocations. Applications were received from May 22, 2024 to Jan 5, 2026.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid117$2,586
Reserved76,288$853,953
Pending Reservation9124$232,852
Waitlist114$30,104
Cancelled352$25,054

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Residential Solar and Storage Equity - AB 209 Non-POU14194$451,4300$0
Small Residential Storage466$9,9101$2,586
Large-Scale Storage26,219$665,7710$0
Equity Resiliency117$17,4380$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1112396ENPOWER STAR LLC (Limited Liability)CLEARA General Engineering Contractor; C-10 Electrical ContractorNov 7, 2023Nov 30, 2027108
1089807ENPOWER STAR (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning ContractorApr 11, 2022Apr 30, 202831

License numbers are the ones the utilities recorded on the interconnection applications (139 of 139 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for licenses 1112396, 1089807. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Los Angeles77
San Bernardino18
Riverside17
Ventura15
Orange4
Kern2
Alameda1
Fresno1
Napa1
San Diego1
San Joaquin1
San Luis Obispo1

Top cities

CityInstalls
Palmdale28
Simi Valley11
Moreno Valley10
Lancaster9
San Bernardino8
Calabasas6
Perris4
Agoura Hills3
Littlerock3
Rancho Palos Verdes3
Castaic2
Fontana2
Lake Arrowhead2
Long Beach2
Newbury Park2

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ENPOWER STAR LLC107
ENPOWER STAR31
Enpower Star1

Common questions

Where does ENPOWER STAR LLC install solar?

Its installs are spread across 12 counties. The most are in Los Angeles County (77 installs), followed by San Bernardino County (18).

How often does ENPOWER STAR LLC install batteries with solar?

83.3% of its interconnected solar installs include battery storage across all years, and 93.5% in the last 24 months (100 of 107). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many ENPOWER STAR LLC installs are under NEM 3.0 (the Net Billing Tariff)?

127 of its 139 interconnected installs (91.4% of the 139 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 88.9% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.