FIRST AMERICAN SOLAR ELECTRICAL

How many solar installs has FIRST AMERICAN SOLAR ELECTRICAL done in California, and which license number is on its installs?

FIRST AMERICAN SOLAR ELECTRICAL has 109 residential solar installs interconnected in California, active in the records from 2021 through 2026 (Apr 16, 2021 to Aug 11, 2026), most of them in Los Angeles County (99), Riverside County (4) and Ventura County (4). CSLB lists license 1009839 (FIRST AMERICAN SOLAR ELECTRICAL) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Dec 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
109
Last 24 months
34
Total capacity
1,046.1 kW DC
Median system size
9.2 kW DC
With battery storage
33.9% all time; 85.3% last 24 months
Third-party owned
0.0% of 109 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
34 installs, latest Aug 11, 2026
Ownership types recorded
none recorded
Median battery size
13.5 kWh (37 installs list a capacity)
First install
Apr 16, 2021
Latest install
Aug 11, 2026
Counties
5
Utilities
SCE 109
CSLB license
1009839

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
202180
2022283
2023364
202452
20251511
2026 (through Aug 31, 2026)1717

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

34 of its 109 interconnected installs (31.2% of the 109 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 88.2% of those include battery storage. The latest Net Billing Tariff install was approved Aug 11, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.07568.8%7 (9.3%)
Net Billing Tariff3431.2%30 (88.2%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on FIRST AMERICAN SOLAR ELECTRICAL’s installs. No residential system in the file lists a third-party owner name that matches FIRST AMERICAN SOLAR ELECTRICAL exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 34 of FIRST AMERICAN SOLAR ELECTRICAL’s 34 installs name a module maker in the “Generator Manufacturer” fields, and most of those (30, 88.2%) used modules recorded as REC.

In the last 24 months, 34 of FIRST AMERICAN SOLAR ELECTRICAL’s 34 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (13, 38.2%) used inverters recorded as Tesla.

In the last 24 months, 19 of FIRST AMERICAN SOLAR ELECTRICAL’s 34 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (12, 63.2%) used batteries recorded as Tesla.

26 of 37 battery-paired PG&E and SCE installs (70.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC3055
Fox ESS77
Qcells348
Fox ESS PowerQ22
Aptos Solar11
Inverter makerTesla1314
Foxess1111
Enphase935
SolarEdge135
SunPower111
Battery makerTesla1212
Enphase611
Fox11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 105 of 109 installs, inverters on 109. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names FIRST AMERICAN SOLAR ELECTRICAL as developer on 0 battery storage projects and as installer on 1 (0 name it as both), 1 projects in all with 10 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Aug 26, 2025 to Aug 26, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Reserved110$9,518

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency110$9,5180$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1009839FIRST AMERICAN SOLAR ELECTRICAL (Corporation)CLEARB General Building ContractorDec 21, 2015Dec 31, 2027109

License numbers are the ones the utilities recorded on the interconnection applications (109 of 109 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1009839. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Los Angeles99
Riverside4
Ventura4
Orange1
San Bernardino1

Top cities

CityInstalls
La Canada24
La Crescenta10
Altadena6
Temple City5
Alhambra4
Rancho Palos Verdes4
San Gabriel4
San Marino4
Arcadia3
Whittier3
Canyon Country2
Corona2
El Segundo2
Hacienda Heights2
Inglewood2

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
FIRST AMERICAN SOLAR ELECTRICAL109

Common questions

Where does FIRST AMERICAN SOLAR ELECTRICAL install solar?

Its installs are spread across 5 counties. The most are in Los Angeles County (99 installs), followed by Riverside County (4).

How often does FIRST AMERICAN SOLAR ELECTRICAL install batteries with solar?

33.9% of its interconnected solar installs include battery storage across all years, and 85.3% in the last 24 months (29 of 34).

How many FIRST AMERICAN SOLAR ELECTRICAL installs are under NEM 3.0 (the Net Billing Tariff)?

34 of its 109 interconnected installs (31.2% of the 109 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 88.2% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.