FLEX ENERGY ELECTRIC LLC

How many solar installs has FLEX ENERGY ELECTRIC LLC done in California, and which license number is on its installs?

FLEX ENERGY ELECTRIC LLC has 204 residential solar installs interconnected in California, active in the records from 2023 through 2026 (Feb 9, 2023 to Mar 20, 2026), most of them in Kern County (125), Tulare County (44) and Fresno County (15). The license number recorded on most of its installs, 1099198, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
204
Last 24 months
25
Total capacity
2,042.4 kW DC
Median system size
7.6 kW DC
With battery storage
4.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 204 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
18 installs, latest Oct 30, 2024
Ownership types recorded
none recorded
Median battery size
13.6 kWh (5 installs list a capacity)
First install
Feb 9, 2023
Latest install
Mar 20, 2026
Counties
9
Utilities
PGE 139, SCE 63, SDGE 2
CSLB license
1099198

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2023 to 2026

YearInstalls interconnectedWith battery storage
20231590
2024298
2025150
2026 (through Aug 31, 2026)10

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

18 of its 204 interconnected installs (8.8% of the 204 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 44.4% of those include battery storage. The latest Net Billing Tariff install was approved Oct 30, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.010.5%not counted
NEM 2.018590.7%0 (0.0%)
Net Billing Tariff188.8%8 (44.4%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on FLEX ENERGY ELECTRIC LLC’s installs. No residential system in the file lists a third-party owner name that matches FLEX ENERGY ELECTRIC LLC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 16 of FLEX ENERGY ELECTRIC LLC’s 25 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (3, 18.8%) used modules recorded as Trina Solar.

In the last 24 months, 25 of FLEX ENERGY ELECTRIC LLC’s 25 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (13, 52.0%) used inverters recorded as SolarEdge.

In the last 24 months, none of FLEX ENERGY ELECTRIC LLC’s 25 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

7 of 8 battery-paired PG&E and SCE installs (87.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerTrina Solar325
VSUN (Vietnam Sunergy)3not in top list
Aptos Solar228
Mission Solar213
Phono Solar Technology233
Inverter makerSolarEdge1393
APsystems (Altenergy Power System)1050
Enphase584
ABB24
Solis (Ginlong)1not in top list
Battery makerFranklinWH05
SolarEdge02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 160 of 204 installs, inverters on 204. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1099198Not found in the CSLB License Master file pulled Nov 4, 2026204

License numbers are the ones the utilities recorded on the interconnection applications (204 of 204 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Kern125
Tulare44
Fresno15
Orange9
Los Angeles6
Kings2
Madera1
Riverside1
San Bernardino1

Top cities

CityInstalls
Bakersfield103
Porterville26
Fresno9
Shafter6
Springville6
Taft6
Lancaster5
Santa Ana5
Visalia5
Tulare4
Arvin3
Sanger3
Fullerton2
San Clemente2
Coalinga1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
FLEX ENERGY ELECTRIC LLC202
Flex Energy Electric2

Common questions

Where does FLEX ENERGY ELECTRIC LLC install solar?

Its installs are spread across 9 counties. The most are in Kern County (125 installs), followed by Tulare County (44).

How often does FLEX ENERGY ELECTRIC LLC install batteries with solar?

4.0% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 25). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many FLEX ENERGY ELECTRIC LLC installs are under NEM 3.0 (the Net Billing Tariff)?

18 of its 204 interconnected installs (8.8% of the 204 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 44.4% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.