FULFILL POWER INC

How many solar installs has FULFILL POWER INC done in California, and which license number is on its installs?

FULFILL POWER INC has 66 residential solar installs interconnected in California, active in the records from 2024 through 2026 (Dec 13, 2024 to Aug 31, 2026), most of them in Los Angeles County (23), Riverside County (16) and Kern County (8). CSLB lists license 1115791 (FULFILL POWER INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jan 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
66
Last 24 months
66
Total capacity
484.9 kW DC
Median system size
6.7 kW DC
With battery storage
100.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 100.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
68.2% of 66 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
65 installs, latest Aug 31, 2026
Ownership types recorded
PPA 45
Median battery size
13.5 kWh (62 installs list a capacity)
First install
Dec 13, 2024
Latest install
Aug 31, 2026
Counties
10
Utilities
SCE 57, PGE 8, SDGE 1
CSLB license
1115791

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2024 to 2026

YearInstalls interconnectedWith battery storage
202411
20252928
2026 (through Aug 31, 2026)3636

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

65 of its 66 interconnected installs (98.5% of the 66 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.011.5%not counted
NEM 2.000.0%0
Net Billing Tariff6598.5%64 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 45 of FULFILL POWER INC’s installs the utility recorded a third-party ownership type: PPA 45, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches FULFILL POWER INC exactly.

Third-party owner named on its installsInstalls
GoodLeap31
Good Leap12
Palmetto Lightreach2

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 66 of FULFILL POWER INC’s 66 installs name a module maker in the “Generator Manufacturer” fields, and most of those (42, 63.6%) used modules recorded as Qcells.

In the last 24 months, 66 of FULFILL POWER INC’s 66 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (33, 50.0%) used inverters recorded as Tesla.

In the last 24 months, 63 of FULFILL POWER INC’s 66 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (32, 50.8%) used batteries recorded as Tesla.

63 of 65 battery-paired PG&E and SCE installs (96.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells4242
Mission Solar1919
Hyundai33
Aptos Solar22
Canadian Solar11
Inverter makerTesla3333
Enphase3232
SolarEdge22
ABB11
EG411
Battery makerTesla3232
Enphase3030
SolarEdge11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 66 of 66 installs, inverters on 66. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1115791FULFILL POWER INC (Corporation)CLEARC-10 Electrical ContractorJan 30, 2024Jan 31, 202866

License numbers are the ones the utilities recorded on the interconnection applications (66 of 66 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1115791. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list FULFILL POWER INC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20252026Total
unincorporated San Diego County1115791112

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Los Angeles23
Riverside16
Kern8
San Bernardino8
Ventura4
Orange3
Alameda1
Madera1
San Diego1
Tulare1

Top cities

CityInstalls
Lancaster6
Hemet5
Palmdale4
Compton3
Perris3
La Puente2
Mc Farland2
Mcfarland2
Pico Rivera2
Rialto2
San Jacinto2
Arvin1
Bakersfield1
Bellflower1
Brea1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
FULFILL POWER INC65
Fulfill Power1

Common questions

Where does FULFILL POWER INC install solar?

Its installs are spread across 10 counties. The most are in Los Angeles County (23 installs), followed by Riverside County (16).

How often does FULFILL POWER INC install batteries with solar?

100.0% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (65 of 65). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many FULFILL POWER INC installs are under NEM 3.0 (the Net Billing Tariff)?

65 of its 66 interconnected installs (98.5% of the 66 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.