Golden Gate Electric Service Partnership

How many solar installs has Golden Gate Electric Service Partnership done in California, and which license number is on its installs?

Golden Gate Electric Service Partnership has 89 residential solar installs interconnected in California, active in the records from 2015 through 2026 (May 18, 2015 to Apr 16, 2026), most of them in Sutter County (25), San Joaquin County (12) and El Dorado County (10). The license number recorded on most of its installs, 997253, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
89
Last 24 months
2
Total capacity
789.7 kW DC
Median system size
8.1 kW DC
With battery storage
1.1% all time; 50.0% last 24 months
Third-party owned
1.1% of 89 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
other 1
First install
May 18, 2015
Latest install
Apr 16, 2026
Counties
18
Utilities
PGE 89
CSLB license
997253

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
201550
201660
201750
201860
201970
2020100
2021200
202250
2023210
202431
202500
2026 (through Aug 31, 2026)10

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 89 interconnected installs with a tariff recorded (89) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.01112.4%not counted
NEM 2.07887.6%1 (1.3%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of Golden Gate Electric Service Partnership’s installs the utility recorded a third-party ownership type: PPA 0, lease 0, prepaid lease 0, other 1. No residential system in the file lists a third-party owner name that matches Golden Gate Electric Service Partnership exactly.

Third-party owner named on its installsInstalls
EZ Solar Loan1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 2 of Golden Gate Electric Service Partnership’s 2 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (1, 50.0%) used modules recorded as Canadian Solar.

In the last 24 months, 2 of Golden Gate Electric Service Partnership’s 2 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (2, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 1 of Golden Gate Electric Service Partnership’s 2 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as Enphase.

1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar1not in top list
Qcells131
Inverter makerEnphase242
Battery makerEnphase11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 82 of 89 installs, inverters on 89. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
997253Not found in the CSLB License Master file pulled Nov 4, 202687

License numbers are the ones the utilities recorded on the interconnection applications (89 of 89 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list Golden Gate Electric Service Partnership’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2020Total
City and County of San Francisco99725311

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Sutter25
San Joaquin12
El Dorado10
Tehama7
Yolo6
Yuba5
Solano4
Butte3
Contra Costa3
Placer3
Mendocino2
San Francisco2
Sonoma2
Alameda1
Fresno1
Marin1
Merced1
Napa1

Top cities

CityInstalls
Yuba City24
Stockton7
Corning5
West Sacramento5
Cameron Park3
El Dorado Hills3
Marysville3
Shingle Springs3
Tracy3
Gerber2
Olivehurst2
San Francisco2
Santa Rosa2
Ukiah2
American Canyon1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
GOLDEN GATE ELECTRIC SERVICE PARTNERSHIP61
Golden Gate Electric Service Partnership28

Common questions

Where does Golden Gate Electric Service Partnership install solar?

Its installs are spread across 18 counties. The most are in Sutter County (25 installs), followed by San Joaquin County (12).

How often does Golden Gate Electric Service Partnership install batteries with solar?

1.1% of its interconnected solar installs include battery storage across all years, and 50.0% in the last 24 months (1 of 2).

How many Golden Gate Electric Service Partnership installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 89 interconnected installs with a tariff recorded (89) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.