GoSolarPros dba GSP Power, inc.

How many solar installs has GoSolarPros dba GSP Power, inc. done in California, and which license number is on its installs?

GoSolarPros dba GSP Power, inc. has 58 residential solar installs interconnected in California, active in the records from 2015 through 2021 (Aug 5, 2015 to Dec 22, 2021), most of them in Alameda County (15), Tuolumne County (13) and Contra Costa County (8). CSLB lists license 1005174 (GSP POWER) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-36, C-46, expires Jul 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
58
Last 24 months
0
Total capacity
433.6 kW DC
Median system size
6.7 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 58 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Aug 5, 2015
Latest install
Dec 22, 2021
Counties
9
Utilities
PGE 58
CSLB license
1005174

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
201550
2016160
2017220
2018120
201920
202000
202110
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 58 interconnected installs with a tariff recorded (58) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.02136.2%not counted
NEM 2.03763.8%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on GoSolarPros dba GSP Power, inc.’s installs. No residential system in the file lists a third-party owner name that matches GoSolarPros dba GSP Power, inc. exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 56 of GoSolarPros dba GSP Power, inc.’s 58 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (24, 42.9%) used modules recorded as Canadian Solar.

Across all years, 58 of GoSolarPros dba GSP Power, inc.’s 58 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (55, 94.8%) used inverters recorded as SolarEdge.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar024
Qcells09
Silfab07
Hansol Technics04
LG04
Inverter makerSolarEdge055
SMA02
Enphase01
Fronius01
Siemens Solar Industries01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 56 of 58 installs, inverters on 58. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1005174GSP POWER (Corporation)CLEAR, Class Removal PendingC-10 Electrical Contractor; C-36; C-46 Solar ContractorJul 2, 2015Jul 31, 202756

License numbers are the ones the utilities recorded on the interconnection applications (58 of 58 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The License Master file lists a pending classification removal date of Jan 4, 2027 for license 1005174. A pending date is CSLB’s scheduled action if the underlying requirement is not met; it is not a finding of wrongdoing.

What a disciplinary bond is: CSLB’s Bond Basics page says that when a license has been revoked, or in some instances suspended, for a violation of the Contractors State License Law, the contractor must file a disciplinary bond with the Registrar to reinstate, reissue or reapply for a license, and that the bond must stay on file for at least two years (CSLB Bond Basics). The file gives one disciplinary bond entry per license and does not say which of those circumstances applied, what the case was about or how it ended. CSLB’s license detail page shows any public disciplinary action.

Other names reported under the same license

Counties

CountyInstalls
Alameda15
Tuolumne13
Contra Costa8
San Joaquin8
Santa Clara8
Calaveras3
Madera1
Napa1
Stanislaus1

Top cities

CityInstalls
Pleasanton8
Sonora8
Fremont5
San Jose5
Stockton5
Groveland4
San Ramon4
Murphys3
Danville2
Manteca2
American Canyon1
Campbell1
La Grange1
Livermore1
Los Altos Hills1

Names as recorded by the utilities

The utilities recorded this installer under 14 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
GoSolarPros dba GSP Power, inc.21
GoSolarPros14
GoSolarPros DBA GSP Power10
goSolarPros dba GSP Power, inc.3
goSolarPros DBA GSP Power1
GoSolarPros dba GSP Power1
GoSolarPros dba GSP POWER1
GOSolarPros DBA GSP Power1
GoSolarPros DBA GSP Power Inc1
GoSolarPros dba GSP Power Inc.1
Gosolarpros dba GSP Power, inc1
GoSolarPros dba GSP Power, Inc.1
GoSolarPros Dba GSP Power, Inc.1
GoSolarPros DBA GSP Power, Inc.1

Common questions

Where does GoSolarPros dba GSP Power, inc. install solar?

Its installs are spread across 9 counties. The most are in Alameda County (15 installs), followed by Tuolumne County (13).

How often does GoSolarPros dba GSP Power, inc. install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many GoSolarPros dba GSP Power, inc. installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 58 interconnected installs with a tariff recorded (58) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.