GSP POWER

How many solar installs has GSP POWER done in California, and which license number is on its installs?

GSP POWER has 53 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Oct 7, 2019 to Apr 15, 2026), most of them in Alameda County (10), Santa Clara County (10) and Contra Costa County (8). CSLB lists license 1005174 (GSP POWER) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-36, C-46, expires Jul 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
53
Last 24 months
10
Total capacity
426.4 kW DC
Median system size
7.6 kW DC
With battery storage
9.4% all time; 50.0% last 24 months
Third-party owned
0.0% of 53 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
5 installs, latest Jan 16, 2026
Ownership types recorded
none recorded
Median battery size
1 kWh (3 installs list a capacity)
First install
Oct 7, 2019
Latest install
Apr 15, 2026
Counties
14
Utilities
PGE 53
CSLB license
1005174

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
201960
2020130
202140
202260
2023110
202440
202554
2026 (through Aug 31, 2026)41

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

5 of its 53 interconnected installs (9.4% of the 53 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The latest Net Billing Tariff install was approved Jan 16, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.04890.6%0 (0.0%)
Net Billing Tariff59.4%5 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on GSP POWER’s installs. No residential system in the file lists a third-party owner name that matches GSP POWER exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 8 of GSP POWER’s 10 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (2, 25.0%) used modules recorded as Aptos Solar.

In the last 24 months, 10 of GSP POWER’s 10 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (6, 60.0%) used inverters recorded as Enphase.

In the last 24 months, 3 of GSP POWER’s 10 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (2, 66.7%) used batteries recorded as Tesla.

3 of 5 battery-paired PG&E and SCE installs (60.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerAptos Solar2not in top list
CertainTeed2not in top list
Axitec15
Hansol Technics1not in top list
Qcells117
Inverter makerEnphase621
Tesla33
SMA27
SolarEdge126
SunPower11
Battery makerTesla22
Enphase11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 48 of 53 installs, inverters on 53. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1005174GSP POWER (Corporation)CLEAR, Class Removal PendingC-10 Electrical Contractor; C-36; C-46 Solar ContractorJul 2, 2015Jul 31, 202753

License numbers are the ones the utilities recorded on the interconnection applications (53 of 53 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The License Master file lists a pending classification removal date of Jan 4, 2027 for license 1005174. A pending date is CSLB’s scheduled action if the underlying requirement is not met; it is not a finding of wrongdoing.

What a disciplinary bond is: CSLB’s Bond Basics page says that when a license has been revoked, or in some instances suspended, for a violation of the Contractors State License Law, the contractor must file a disciplinary bond with the Registrar to reinstate, reissue or reapply for a license, and that the bond must stay on file for at least two years (CSLB Bond Basics). The file gives one disciplinary bond entry per license and does not say which of those circumstances applied, what the case was about or how it ended. CSLB’s license detail page shows any public disciplinary action.

Other names reported under the same license

Counties

CountyInstalls
Alameda10
Santa Clara10
Contra Costa8
Tuolumne6
San Joaquin4
Calaveras3
Marin2
Monterey2
Napa2
Stanislaus2
El Dorado1
Merced1
Sacramento1
Sonoma1

Top cities

CityInstalls
San Jose4
Sonora4
Pleasanton3
Wallace3
Berkeley2
Napa2
Oakdale2
Oakland2
Saratoga2
Walnut Creek2
Campbell1
Castro Valley1
Danville1
Dublin1
Hayward1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
GSP POWER53

Common questions

Where does GSP POWER install solar?

Its installs are spread across 14 counties. The most are in Alameda County (10 installs), followed by Santa Clara County (10).

How often does GSP POWER install batteries with solar?

9.4% of its interconnected solar installs include battery storage across all years, and 50.0% in the last 24 months (5 of 10).

How many GSP POWER installs are under NEM 3.0 (the Net Billing Tariff)?

5 of its 53 interconnected installs (9.4% of the 53 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.