GREEN ENERGY EPC by Makello Inc.

How many solar installs has GREEN ENERGY EPC by Makello Inc. done in California, and which license number is on its installs?

GREEN ENERGY EPC by Makello Inc. has 411 residential solar installs interconnected in California, active in the records from 2013 through 2026 (Sep 12, 2013 to Apr 22, 2026), most of them in San Diego County (408), Orange County (2) and Marin County (1). The license number recorded on most of its installs, 978836, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. CSLB lists license 1110498 (GREEN ENERGY EPC BY MAKELLO INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Sep 30, 2027, recorded on 22 of its installs.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to GREEN ENERGY EPC by Makello Inc. here carry more than one CSLB license number: 978836 on 287 (not found in the CSLB License Master file) and 1110498 on 22 (CSLB holder GREEN ENERGY EPC BY MAKELLO INC, San Diego), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
411
Last 24 months
30
Total capacity
2,445.1 kW DC
Median system size
5.4 kW DC
With battery storage
100.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 100.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 386 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
7 installs, latest Mar 20, 2026
Ownership types recorded
none recorded
First install
Sep 12, 2013
Latest install
Apr 22, 2026
Counties
3
Utilities
SDGE 410, PGE 1
CSLB license
978836, 1110498

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2013 to 2026

YearInstalls interconnectedWith battery storage
201340
2014120
2015490
2016510
2017400
2018410
2019570
2020300
2021140
2022350
2023350
2024221
2025180
2026 (through Aug 31, 2026)30

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

7 of its 411 interconnected installs (1.7% of the 409 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Mar 20, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.010625.9%not counted
NEM 2.029672.4%not recorded
Net Billing Tariff71.7%1 (100.0%)
Not recorded2

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on GREEN ENERGY EPC by Makello Inc.’s installs. No residential system in the file lists a third-party owner name that matches GREEN ENERGY EPC by Makello Inc. exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 7 of GREEN ENERGY EPC by Makello Inc.’s 30 installs name a module maker in the “Generator Manufacturer” fields, and most of those (5, 71.4%) used modules recorded as Qcells.

In the last 24 months, 28 of GREEN ENERGY EPC by Makello Inc.’s 30 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (23, 82.1%) used inverters recorded as Enphase.

0 of 1 battery-paired PG&E and SCE installs (0.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells572
HDHYUNDAIENERGYSOLUTIONSCO.,LTD.2not in top list
Inverter makerEnphase23272
SMA329
SolarEdge3114
SavantSystemsInc.1not in top list
SMAAmerica12

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 362 of 411 installs, inverters on 409. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names GREEN ENERGY EPC by Makello Inc. as developer on 27 battery storage projects and as installer on 9 (9 name it as both), 27 projects in all with 362 kWh of storage. 16 have the status Paid, with $57,041 in current incentive allocations. Applications were received from Dec 30, 2021 to Sep 18, 2026.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid16217$57,041
Waitlist223$24,852
Cancelled9123$28,104

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage20243$33,67213$23,821
Large-Scale Storage258$17,4711$8,735
Residential Solar and Storage Equity - AB 209223$24,8520$0
Residential Storage Equity229$24,4842$24,484
Equity Resiliency110$9,5180$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
978836Not found in the CSLB License Master file pulled Nov 4, 2026287
1110498GREEN ENERGY EPC BY MAKELLO INC (Corporation)CLEARC-10 Electrical ContractorSep 25, 2023Sep 30, 202722

License numbers are the ones the utilities recorded on the interconnection applications (316 of 411 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1110498. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list GREEN ENERGY EPC by Makello Inc.’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2018201920202021202220232024Total
unincorporated San Diego County97883612163175145

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego408
Orange2
Marin1

Top cities

CityInstalls
San Diego178
Encinitas33
La Mesa28
Carlsbad24
Cardiff17
La Jolla13
Escondido12
Oceanside12
Spring Valley12
El Cajon10
Poway8
Solana Beach8
Chula Vista7
San Marcos7
Vista7

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
GREEN ENERGY EPC by Makello Inc.410
GREEN ENERGY EPC BY MAKELLO INC1

Common questions

Where does GREEN ENERGY EPC by Makello Inc. install solar?

Its installs are spread across 3 counties. The most are in San Diego County (408 installs), followed by Orange County (2).

How often does GREEN ENERGY EPC by Makello Inc. install batteries with solar?

100.0% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (1 of 1). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many GREEN ENERGY EPC by Makello Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

7 of its 411 interconnected installs (1.7% of the 409 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.