HENO ELECTRICAL SERVICES

How many solar installs has HENO ELECTRICAL SERVICES done in California, and which license number is on its installs?

HENO ELECTRICAL SERVICES has 37 residential solar installs interconnected in California, active in the records from 2020 through 2022 (Dec 31, 2020 to Jun 30, 2022), most of them in Los Angeles County (24), Ventura County (6) and Orange County (4). The license number recorded on most of its installs, 1026042, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
37
Last 24 months
0
Total capacity
313.7 kW DC
Median system size
7.2 kW DC
With battery storage
2.8% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 37 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
Median battery size
9.8 kWh (1 installs list a capacity)
First install
Dec 31, 2020
Latest install
Jun 30, 2022
Counties
6
Utilities
SCE 34, PGE 2, SDGE 1
CSLB license
1026042

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2020 to 2026

YearInstalls interconnectedWith battery storage
202010
2021351
202210
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 37 interconnected installs with a tariff recorded (37) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.037100.0%1 (2.8%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on HENO ELECTRICAL SERVICES’s installs. No residential system in the file lists a third-party owner name that matches HENO ELECTRICAL SERVICES exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 36 of HENO ELECTRICAL SERVICES’ 37 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (18, 50.0%) used modules recorded as Qcells.

Across all years, 37 of HENO ELECTRICAL SERVICES’ 37 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (17, 45.9%) used inverters recorded as SolarEdge.

Across all years, 1 of HENO ELECTRICAL SERVICES’ 37 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as LG.

1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells018
Hyundai011
Aptos Solar04
LG03
Inverter makerSolarEdge017
Enphase012
SunPower04
Delta Electronics02
Canadian Solar01
Battery makerLG01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 36 of 37 installs, inverters on 37. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1026042Not found in the CSLB License Master file pulled Nov 4, 202637

License numbers are the ones the utilities recorded on the interconnection applications (37 of 37 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles24
Ventura6
Orange4
Fresno1
Kern1
San Diego1

Top cities

CityInstalls
Lancaster3
Simi Valley3
Long Beach2
Oxnard2
Palmdale2
Bakersfield1
Brea1
Calabasas1
Canyon Country1
Culver City1
Fresno1
Garden Grove1
Glendora1
Harbor City1
Irvine1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
HENO ELECTRICAL SERVICES37

Common questions

Where does HENO ELECTRICAL SERVICES install solar?

Its installs are spread across 6 counties. The most are in Los Angeles County (24 installs), followed by Ventura County (6).

How often does HENO ELECTRICAL SERVICES install batteries with solar?

2.8% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many HENO ELECTRICAL SERVICES installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 37 interconnected installs with a tariff recorded (37) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.