JAMES PETERSEN INDUSTRIES INC
How many solar installs has JAMES PETERSEN INDUSTRIES INC done in California, and which license number is on its installs?
JAMES PETERSEN INDUSTRIES INC has 815 residential solar installs interconnected in California, active in the records from 2019 through 2022 (Feb 15, 2019 to May 18, 2022), most of them in Los Angeles County (297), San Bernardino County (168) and Riverside County (158). The license number recorded on most of its installs, 1050201, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 815
- Last 24 months
- 0
- Total capacity
- 5,737.8 kW DC
- Median system size
- 6.7 kW DC
- With battery storage
- 23.2% all time; no installs in the last 24 months last 24 months
- Third-party owned
- 0.0% of 815 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 0 installs
- Ownership types recorded
- none recorded
- Median battery size
- 9.8 kWh (189 installs list a capacity)
- First install
- Feb 15, 2019
- Latest install
- May 18, 2022
- Counties
- 10
- Utilities
- SCE 813, PGE 2
- CSLB license
- 1050201
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2019 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2019 | 513 | 131 |
| 2020 | 295 | 58 |
| 2021 | 6 | 0 |
| 2022 | 1 | 0 |
| 2023 | 0 | 0 |
| 2024 | 0 | 0 |
| 2025 | 0 | 0 |
| 2026 (through Aug 31, 2026) | 0 | 0 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
None of its 815 interconnected installs with a tariff recorded (815) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 7 | 0.9% | not counted |
| NEM 2.0 | 808 | 99.1% | 182 (22.5%) |
| Net Billing Tariff | 0 | 0.0% | 0 |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
The utilities recorded no third-party ownership type (PPA or lease) on JAMES PETERSEN INDUSTRIES INC’s installs. No residential system in the file lists a third-party owner name that matches JAMES PETERSEN INDUSTRIES INC exactly.
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
Across all years, 815 of JAMES PETERSEN INDUSTRIES INC’s 815 installs name a module maker in the “Generator Manufacturer” fields, and most of those (600, 73.6%) used modules recorded as Silfab.
Across all years, 815 of JAMES PETERSEN INDUSTRIES INC’s 815 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (550, 67.5%) used inverters recorded as SolarEdge.
Across all years, 189 of JAMES PETERSEN INDUSTRIES INC’s 815 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (150, 79.4%) used batteries recorded as LG.
189 of 189 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Silfab | 0 | 600 |
| Mission Solar | 0 | 149 | |
| LG | 0 | 24 | |
| SolarWorld | 0 | 20 | |
| Panasonic | 0 | 17 | |
| Inverter maker | SolarEdge | 0 | 550 |
| Enphase | 0 | 200 | |
| Huawei Technologies Co., Ltd. | 0 | 59 | |
| Fronius | 0 | 3 | |
| SunPower | 0 | 3 | |
| Battery maker | LG | 0 | 150 |
| Tesla | 0 | 39 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 815 of 815 installs, inverters on 815. See the methodology and the equipment index.
SGIP battery storage projects
The SGIP report names JAMES PETERSEN INDUSTRIES INC as developer on 0 battery storage projects and as installer on 72 (0 name it as both), 72 projects in all with 694 kWh of storage. 34 have the status Paid, with $77,207 in current incentive allocations. Applications were received from Dec 7, 2018 to May 26, 2021.
By status
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 34 | 319 | $77,207 |
| Cancelled | 38 | 374 | $89,965 |
By budget category
| Budget category | Projects | Storage kWh | Current incentive | Paid projects | Paid: current incentive |
|---|---|---|---|---|---|
| Small Residential Storage | 72 | 694 | $167,172 | 34 | $77,207 |
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 1050201 | Not found in the CSLB License Master file pulled Nov 4, 2026 | 814 | ||||
License numbers are the ones the utilities recorded on the interconnection applications (814 of 815 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.
Local solar permits naming its license
Solar permits in city and county open data that list JAMES PETERSEN INDUSTRIES INC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.
| Permit data | License | 2018 | 2019 | 2020 | Total |
|---|---|---|---|---|---|
| City and County of San Francisco | 1050201 | 3 | 6 | 4 | 13 |
| unincorporated San Diego County | 1050201 | 0 | 71 | 6 | 77 |
| unincorporated Marin County | 1050201 | 0 | 7 | 3 | 10 |
Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.
Other names reported under the same license
- PetersenDean: 18,503 installs, license 1050201
- SOLAR 4 AMERICA: 1,120 installs, license 1050201
- Solar4America: 120 installs, license 1050201
Counties
| County | Installs |
|---|---|
| Los Angeles | 297 |
| San Bernardino | 168 |
| Riverside | 158 |
| Orange | 130 |
| Ventura | 33 |
| Tulare | 16 |
| Kern | 6 |
| Kings | 5 |
| Napa | 1 |
| Solano | 1 |
Top cities
| City | Installs |
|---|---|
| Gardena | 39 |
| Victorville | 36 |
| Palm Springs | 31 |
| Bellflower | 29 |
| Long Beach | 22 |
| Corona | 20 |
| Yorba Linda | 16 |
| Huntington Beach | 14 |
| Palmdale | 13 |
| Upland | 13 |
| Fontana | 12 |
| San Bernardino | 12 |
| Irvine | 11 |
| Lancaster | 11 |
| Riverside | 11 |
Names as recorded by the utilities
The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| JAMES PETERSEN INDUSTRIES INC | 814 |
| James Petersen Industries, Inc. | 1 |
Common questions
Where does JAMES PETERSEN INDUSTRIES INC install solar?
Its installs are spread across 10 counties. The most are in Los Angeles County (297 installs), followed by San Bernardino County (168).
How often does JAMES PETERSEN INDUSTRIES INC install batteries with solar?
23.2% of its interconnected solar installs include battery storage across all years.
How many JAMES PETERSEN INDUSTRIES INC installs are under NEM 3.0 (the Net Billing Tariff)?
None of its 815 interconnected installs with a tariff recorded (815) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
- Self-Generation Incentive Program (SGIP) program administrators: Real-Time Public Report of SGIP applications (selfgenca.com)
Records last pulled Nov 16, 2026. Every entry links to the original public record.