LivSmart

How many solar installs has LivSmart done in California, and which license number is on its installs?

LivSmart has 103 residential solar installs interconnected in California, active in the records from 2025 through 2026 (Feb 5, 2025 to Aug 26, 2026), most of them in Los Angeles County (29), San Bernardino County (23) and San Diego County (19). CSLB lists license 1111959 (LIVSMART) with status Contr Bond Susp in the License Master file pulled Nov 4, 2026, classifications C-10, expires Oct 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
103
Last 24 months
103
Total capacity
803.1 kW DC
Median system size
7.3 kW DC
With battery storage
100.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 100.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
85.4% of 103 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
101 installs, latest Aug 26, 2026
Ownership types recorded
PPA 68, lease 20
Median battery size
13.5 kWh (81 installs list a capacity)
First install
Feb 5, 2025
Latest install
Aug 26, 2026
Counties
9
Utilities
SCE 81, SDGE 19, PGE 3
CSLB license
1111959

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2025 to 2026

YearInstalls interconnectedWith battery storage
20252220
2026 (through Aug 31, 2026)8164

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

101 of its 103 interconnected installs (98.1% of the 103 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 26, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.011.0%not counted
NEM 2.011.0%1 (100.0%)
Net Billing Tariff10198.1%82 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 88 of LivSmart’s installs the utility recorded a third-party ownership type: PPA 68, lease 20, prepaid lease 0, other 0. Across all installers, 15 residential systems list a third-party owner name that matches LivSmart exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
GoodLeap Financial48
LightReach Financial15
LivSmart15
GoodLeap8
LightReach / Palmetto1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 102 of LivSmart’s 103 installs name a module maker in the “Generator Manufacturer” fields, and most of those (82, 80.4%) used modules recorded as Qcells.

In the last 24 months, 103 of LivSmart’s 103 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (65, 63.1%) used inverters recorded as Tesla.

In the last 24 months, 84 of LivSmart’s 103 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (62, 73.8%) used batteries recorded as Tesla.

84 of 84 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells8282
Silfab1313
JA Solar77
DuCal Solar Technology11
LG11
Inverter makerTesla6565
Enphase3838
SolarEdge33
Power-One11
SMA11
Battery makerTesla6262
Enphase2121
Lion Energy11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 102 of 103 installs, inverters on 103. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1111959LIVSMART (Corporation)Contr Bond SuspC-10 Electrical ContractorOct 26, 2023Oct 31, 2027103

License numbers are the ones the utilities recorded on the interconnection applications (103 of 103 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1111959. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list LivSmart’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20252026Total
unincorporated San Diego County1111959246

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Los Angeles29
San Bernardino23
San Diego19
Riverside18
Orange8
Ventura3
Kern1
San Joaquin1
Santa Barbara1

Top cities

CityInstalls
Temecula8
Escondido7
Norwalk6
Victorville6
San Diego4
Adelanto3
Apple Valley3
Bellflower3
Hesperia3
Pico Rivera3
Corona2
La Puente2
Lancaster2
Long Beach2
Rialto2

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
LIVSMART84
LivSmart19

Common questions

Where does LivSmart install solar?

Its installs are spread across 9 counties. The most are in Los Angeles County (29 installs), followed by San Bernardino County (23).

How often does LivSmart install batteries with solar?

100.0% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (84 of 84). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many LivSmart installs are under NEM 3.0 (the Net Billing Tariff)?

101 of its 103 interconnected installs (98.1% of the 103 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.