LP-Electric

How many solar installs has LP-Electric done in California, and which license number is on its installs?

LP-Electric has 37 residential solar installs interconnected in California, active in the records from 2004 through 2026 (Feb 12, 2004 to Jul 22, 2026), most of them in San Diego County (35), Orange County (1) and Sutter County (1). CSLB lists license 1116039 (LP ELECTRICAL CONTRACTOR INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Feb 29, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
37
Last 24 months
36
Total capacity
214.8 kW DC
Median system size
5.3 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
62.2% of 37 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
35 installs, latest Jul 22, 2026
Ownership types recorded
PPA 21, other 2
First install
Feb 12, 2004
Latest install
Jul 22, 2026
Counties
3
Utilities
SDGE 36, PGE 1
CSLB license
1116039

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2004 to 2026

YearInstalls interconnectedWith battery storage
200410
200500
200600
200700
200800
200900
201000
201100
201200
201300
201400
201500
201600
201700
201800
201900
202000
202100
202200
202300
202400
2025120
2026 (through Aug 31, 2026)240

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

35 of its 37 interconnected installs (94.6% of the 37 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Jul 22, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.012.7%not counted
NEM 2.012.7%not recorded
Net Billing Tariff3594.6%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 23 of LP-Electric’s installs the utility recorded a third-party ownership type: PPA 21, lease 0, prepaid lease 0, other 2. Across all installers, 23 residential systems list a third-party owner name that matches LP-Electric exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
LP-Electric23

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 35 of LP-Electric’s 36 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (14, 40.0%) used modules recorded as JA Solar.

In the last 24 months, 36 of LP-Electric’s 36 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (19, 52.8%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerJA Solar1414
Qcells99
CertainTeed44
HyperionSolar33
HDHYUNDAIENERGYSOLUTIONSCO.,LTD.22
Inverter makerEnphase1919
Tesla1818

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 36 of 37 installs, inverters on 37. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1116039LP ELECTRICAL CONTRACTOR INC (Corporation)CLEARC-10 Electrical ContractorFeb 5, 2024Feb 29, 202836

License numbers are the ones the utilities recorded on the interconnection applications (36 of 37 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1116039. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list LP-Electric’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense202420252026Total
unincorporated San Diego County11160392439

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Diego35
Orange1
Sutter1

Top cities

CityInstalls
Escondido12
El Cajon6
San Diego5
San Marcos3
Campo1
Carlsbad1
Chula Vista1
Del Mar1
Encinitas1
Laguna Niguel1
Pauma Valley1
Poway1
Rio Oso1
San Ysidro1
Spring Valley1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
LP-Electric36
Electric1

Common questions

Where does LP-Electric install solar?

Its installs are spread across 3 counties. The most are in San Diego County (35 installs), followed by Orange County (1).

How often does LP-Electric install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many LP-Electric installs are under NEM 3.0 (the Net Billing Tariff)?

35 of its 37 interconnected installs (94.6% of the 37 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.