LUMENEXX

How many solar installs has LUMENEXX done in California, and which license number is on its installs?

LUMENEXX has 37 residential solar installs interconnected in California, active in the records from 2024 through 2026 (Mar 15, 2024 to Aug 14, 2026), most of them in Los Angeles County (20), San Bernardino County (8) and Orange County (4). CSLB lists license 1114147 (LUMENEXX) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-46, expires Dec 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
37
Last 24 months
34
Total capacity
402.6 kW DC
Median system size
9.4 kW DC
With battery storage
86.5% all time; 91.2% last 24 months
Third-party owned
67.6% of 37 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
37 installs, latest Aug 14, 2026
Ownership types recorded
PPA 25
Median battery size
13.5 kWh (32 installs list a capacity)
First install
Mar 15, 2024
Latest install
Aug 14, 2026
Counties
5
Utilities
SCE 36, PGE 1
CSLB license
1114147

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2024 to 2026

YearInstalls interconnectedWith battery storage
202431
20252321
2026 (through Aug 31, 2026)1110

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

37 of its 37 interconnected installs (100.0% of the 37 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 86.5% of those include battery storage. The latest Net Billing Tariff install was approved Aug 14, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.000.0%0
Net Billing Tariff37100.0%32 (86.5%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 25 of LUMENEXX’s installs the utility recorded a third-party ownership type: PPA 25, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches LUMENEXX exactly.

Third-party owner named on its installsInstalls
Palmetto Finance10
Palmetto8
Axia2
palmetto SolaR2
Light Reach1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 34 of LUMENEXX’s 34 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (14, 41.2%) used modules recorded as JinkoSolar.

In the last 24 months, 34 of LUMENEXX’s 34 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (16, 47.1%) used inverters recorded as Enphase.

In the last 24 months, 30 of LUMENEXX’s 34 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (16, 53.3%) used batteries recorded as Tesla.

31 of 32 battery-paired PG&E and SCE installs (96.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerJinkoSolar1414
Hyundai88
Mission Solar55
Qcells57
Canadian Solar34
Inverter makerEnphase1618
Tesla1616
SolarEdge34
Qcells22
Kaco11
Battery makerTesla1616
Enphase1314
Q Cell11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 37 of 37 installs, inverters on 37. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1114147LUMENEXX (Corporation)CLEARC-46 Solar ContractorDec 19, 2023Dec 31, 202737

License numbers are the ones the utilities recorded on the interconnection applications (37 of 37 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1114147. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Los Angeles20
San Bernardino8
Orange4
Riverside4
Kern1

Top cities

CityInstalls
Palmdale4
San Bernardino3
Fontana2
Los Angeles2
Montebello2
Pico Rivera2
Pomona2
Adelanto1
Bakersfield1
Baldwin Park1
Beaumont1
Downey1
Fullerton1
Garden Grove1
Hemet1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
LUMENEXX37

Common questions

Where does LUMENEXX install solar?

Its installs are spread across 5 counties. The most are in Los Angeles County (20 installs), followed by San Bernardino County (8).

How often does LUMENEXX install batteries with solar?

86.5% of its interconnected solar installs include battery storage across all years, and 91.2% in the last 24 months (31 of 34).

How many LUMENEXX installs are under NEM 3.0 (the Net Billing Tariff)?

37 of its 37 interconnected installs (100.0% of the 37 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 86.5% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.