Milholland Electric Inc

How many solar installs has Milholland Electric Inc done in California, and which license number is on its installs?

Milholland Electric Inc has 3,338 residential solar installs interconnected in California, active in the records from 2009 through 2026 (Oct 19, 2009 to Apr 20, 2026), most of them in San Diego County (2,130), Riverside County (659) and San Bernardino County (328). The license number recorded on most of its installs, 585514, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
3,338
Last 24 months
11
Total capacity
23,241.7 kW DC
Median system size
6.4 kW DC
With battery storage
2.8% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 33.3% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
1.0% of 3,063 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
15 installs, latest Feb 3, 2025
Ownership types recorded
PPA 19, lease 11
Median battery size
3.4 kWh (32 installs list a capacity)
First install
Oct 19, 2009
Latest install
Apr 20, 2026
Counties
9
Utilities
SDGE 2,201, SCE 1,130, PGE 7
CSLB license
585514

Is Milholland Electric Inc still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (2 in all).

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2009 to 2026

YearInstalls interconnectedWith battery storage
200990
2010130
2011250
2012360
2013530
20141010
20151340
20161780
20171620
20182440
20192970
20202641
20212860
202292813
202356816
2024351
202541
2026 (through Aug 31, 2026)10

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

15 of its 3,338 interconnected installs (0.4% of the 3,338 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 22.2% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Feb 3, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.048614.6%not counted
NEM 2.02,83785.0%30 (2.7%)
Net Billing Tariff150.4%2 (22.2%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 30 of Milholland Electric Inc’s installs the utility recorded a third-party ownership type: PPA 19, lease 11, prepaid lease 0, other 0. Across all installers, 23 residential systems list a third-party owner name that matches Milholland Electric Inc exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Milholland Electric23
SUNNOVA3
Everbright1
MILHOLLAND1
Sunpower1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 11 of Milholland Electric Inc’s 11 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (2, 18.2%) used modules recorded as CertainTeed.

In the last 24 months, 11 of Milholland Electric Inc’s 11 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (8, 72.7%) used inverters recorded as Enphase.

In the last 24 months, 1 of Milholland Electric Inc’s 11 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as Enphase.

30 of 32 battery-paired PG&E and SCE installs (93.8%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCertainTeed2550
SEGSolarInc.2not in top list
SunPower21,472
Waaree2not in top list
Aptos Solar1not in top list
Inverter makerEnphase81,041
SunPower21,445
SolarEdge1529
Battery makerEnphase123

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 3,116 of 3,338 installs, inverters on 3,253. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Milholland Electric Inc as developer on 28 battery storage projects and as installer on 40 (28 name it as both), 40 projects in all with 1,103 kWh of storage. 25 have the status Paid, with $481,228 in current incentive allocations. Applications were received from Apr 20, 2012 to Jan 4, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid25716$481,228
Cancelled10318$104,232
RRF Rejected569$17,960

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage18342$57,74512$34,762
Large-Scale Storage4163$48,6262$28,284
Equity Resiliency153$30,2250$0
Not stated17545$466,82411$418,182

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
585514Not found in the CSLB License Master file pulled Nov 4, 20262,891

License numbers are the ones the utilities recorded on the interconnection applications (2,891 of 3,338 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list Milholland Electric Inc’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023Total
City and County of San Francisco5855140000011
unincorporated San Diego County585514545726558327302

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego2,130
Riverside659
San Bernardino328
Orange167
Los Angeles47
Fresno4
Alameda1
Contra Costa1
Madera1

Top cities

CityInstalls
San Diego890
El Cajon148
Chula Vista143
Escondido98
Poway81
Carlsbad77
Hesperia70
Desert Hot Springs69
Hemet69
Santee69
Oceanside62
La Mesa60
Perris57
Cathedral City53
La Jolla46

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Milholland Electric Inc2,202
MILHOLLAND ELECTRIC INC1,127
Milholland Electric, Inc6
Milholland Electric2
MILHOLLAND ELECTRIC INC.1

Common questions

Where does Milholland Electric Inc install solar?

Its installs are spread across 9 counties. The most are in San Diego County (2,130 installs), followed by Riverside County (659).

How often does Milholland Electric Inc install batteries with solar?

2.8% of its interconnected solar installs include battery storage across all years, and 33.3% in the last 24 months (1 of 3). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Milholland Electric Inc installs are under NEM 3.0 (the Net Billing Tariff)?

15 of its 3,338 interconnected installs (0.4% of the 3,338 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 22.2% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.