Mynt Solar

How many solar installs has Mynt Solar done in California, and which license number is on its installs?

Mynt Solar has 47 residential solar installs interconnected in California, active in the records from 2021 through 2025 (Nov 23, 2021 to Jan 27, 2025), most of them in Orange County (16), San Bernardino County (11) and Los Angeles County (10). The license number recorded on most of its installs, 1076310, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
47
Last 24 months
2
Total capacity
465.9 kW DC
Median system size
9 kW DC
With battery storage
7.7% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 50.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
2.1% of 47 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
4 installs, latest Apr 29, 2024
Ownership types recorded
PPA 1
Median battery size
16 kWh (3 installs list a capacity)
First install
Nov 23, 2021
Latest install
Jan 27, 2025
Counties
5
Utilities
SCE 39, SDGE 8
CSLB license
1076310

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
202110
202200
2023350
2024103
202510
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

4 of its 47 interconnected installs (8.5% of the 47 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 50.0% of those include battery storage. The latest Net Billing Tariff install was approved Apr 29, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.04391.5%1 (2.9%)
Net Billing Tariff48.5%2 (50.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 1 of Mynt Solar’s installs the utility recorded a third-party ownership type: PPA 1, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Mynt Solar exactly.

Third-party owner named on its installsInstalls
LENNAR HOMES1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 2 of Mynt Solar’s 2 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (1, 50.0%) used modules recorded as Aptos Solar.

In the last 24 months, 2 of Mynt Solar’s 2 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (2, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 1 of Mynt Solar’s 2 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as SolarEdge.

3 of 3 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerAptos Solar11
Qcells121
Inverter makerEnphase225
Battery makerSolarEdge11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 46 of 47 installs, inverters on 47. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1076310Not found in the CSLB License Master file pulled Nov 4, 202643

License numbers are the ones the utilities recorded on the interconnection applications (47 of 47 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Orange16
San Bernardino11
Los Angeles10
Riverside7
San Diego3

Top cities

CityInstalls
Corona4
Claremont3
Huntington Beach3
Yorba Linda3
Alta Loma2
Carlsbad2
Irvine2
Norco2
Redlands2
San Bernardino2
Santa Ana2
Bellflower1
Coto de Caza1
Dana Point1
Etiwanda1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
MYNT SOLAR LLC39
Mynt Solar8

Common questions

Where does Mynt Solar install solar?

Its installs are spread across 5 counties. The most are in Orange County (16 installs), followed by San Bernardino County (11).

How often does Mynt Solar install batteries with solar?

7.7% of its interconnected solar installs include battery storage across all years, and 50.0% in the last 24 months (1 of 2). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Mynt Solar installs are under NEM 3.0 (the Net Billing Tariff)?

4 of its 47 interconnected installs (8.5% of the 47 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 50.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.