Neutility

How many solar installs has Neutility done in California, and which license number is on its installs?

Neutility has 42 residential solar installs interconnected in California, active in the records from 2016 through 2019 (May 12, 2016 to Oct 30, 2019), most of them in San Diego County (28), Orange County (7) and Los Angeles County (4). The license number recorded on most of its installs, 984617, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
42
Last 24 months
0
Total capacity
249.7 kW DC
Median system size
5.6 kW DC
With battery storage
18.2% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
23.8% of 42 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 3, lease 2, prepaid lease 5
Median battery size
14.7 kWh (2 installs list a capacity)
First install
May 12, 2016
Latest install
Oct 30, 2019
Counties
5
Utilities
SDGE 31, SCE 10, PGE 1
CSLB license
984617, 1023057

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
2016220
2017161
201831
201910
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 42 interconnected installs with a tariff recorded (42) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.01126.2%not counted
NEM 2.03173.8%2 (25.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 10 of Neutility’s installs the utility recorded a third-party ownership type: PPA 3, lease 2, prepaid lease 5, other 0. Across all installers, 7 residential systems list a third-party owner name that matches Neutility exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Neutility6
Ygrene/Neutility2
Neutility/Hero1
Ygrene1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 39 of Neutility’s 42 installs name a module maker in the “Generator Manufacturer” fields, and most of those (28, 71.8%) used modules recorded as EcoSolargy.

Across all years, 42 of Neutility’s 42 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (26, 61.9%) used inverters recorded as Enphase.

Across all years, 2 of Neutility’s 42 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (2, 100.0%) used batteries recorded as LG.

2 of 2 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerEcoSolargy028
LG07
Hyundai03
SolarWorld01
Inverter makerEnphase026
Siemens Industry014
SolarEdge03
Battery makerLG02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 39 of 42 installs, inverters on 42. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Neutility as developer on 0 battery storage projects and as installer on 2 (0 name it as both), 2 projects in all with 17 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Dec 12, 2017 to Dec 27, 2017.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled217$6,715

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage217$6,7150$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
984617Not found in the CSLB License Master file pulled Nov 4, 202623
1023057Not found in the CSLB License Master file pulled Nov 4, 202610

License numbers are the ones the utilities recorded on the interconnection applications (33 of 42 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
San Diego28
Orange7
Los Angeles4
Tulare2
San Bernardino1

Top cities

CityInstalls
Escondido10
San Diego7
El Cajon2
Newport Beach2
Spring Valley2
Carlsbad1
Chula Vista1
Dinuba1
Garden Grove1
Hawthorne1
Huntington Beach1
La Puente1
Ladera Ranch1
Laguna Niguel1
Lakewood1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Neutility34
NEUTILITY LLC8

Common questions

Where does Neutility install solar?

Its installs are spread across 5 counties. The most are in San Diego County (28 installs), followed by Orange County (7).

How often does Neutility install batteries with solar?

18.2% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Neutility installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 42 interconnected installs with a tariff recorded (42) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.