ORION SOLAR AND ELECTRIC

How many solar installs has ORION SOLAR AND ELECTRIC done in California, and which license number is on its installs?

ORION SOLAR AND ELECTRIC has 89 residential solar installs interconnected in California, active in the records from 2022 through 2026 (Jan 7, 2022 to Aug 27, 2026), most of them in Sutter County (50), Yuba County (18) and Butte County (7). CSLB lists license 1078291 (ORION SOLAR AND ELECTRIC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jul 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
89
Last 24 months
14
Total capacity
854.7 kW DC
Median system size
9.4 kW DC
With battery storage
31.5% all time; 92.9% last 24 months
Third-party owned
23.6% of 89 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
26 installs, latest Aug 27, 2026
Ownership types recorded
PPA 20, prepaid lease 1
Median battery size
13.5 kWh (6 installs list a capacity)
First install
Jan 7, 2022
Latest install
Aug 27, 2026
Counties
11
Utilities
PGE 89
CSLB license
1078291

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2022 to 2026

YearInstalls interconnectedWith battery storage
2022221
2023350
20241814
202598
2026 (through Aug 31, 2026)55

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

26 of its 89 interconnected installs (29.2% of the 89 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The latest Net Billing Tariff install was approved Aug 27, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.06370.8%2 (3.2%)
Net Billing Tariff2629.2%26 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 21 of ORION SOLAR AND ELECTRIC’s installs the utility recorded a third-party ownership type: PPA 20, lease 0, prepaid lease 1, other 0. No residential system in the file lists a third-party owner name that matches ORION SOLAR AND ELECTRIC exactly.

Third-party owner named on its installsInstalls
Sunrun13
EverBright Solar2
Goodleap2
Good Leap1
Goodleap PPA1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 14 of ORION SOLAR AND ELECTRIC’s 14 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (6, 42.9%) used modules recorded as LONGi.

In the last 24 months, 14 of ORION SOLAR AND ELECTRIC’s 14 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (7, 50.0%) used inverters recorded as Tesla.

In the last 24 months, 11 of ORION SOLAR AND ELECTRIC’s 14 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (5, 45.5%) used batteries recorded as Enphase.

26 of 28 battery-paired PG&E and SCE installs (92.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLONGi615
Qcells611
United Renewable Energy38
REC1not in top list
SunPower1not in top list
Inverter makerTesla711
Enphase655
EcoFlow11
Fronius1not in top list
SolarEdge125
Battery makerEnphase516
Tesla59
EcoFlow11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 83 of 89 installs, inverters on 89. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1078291ORION SOLAR AND ELECTRIC (Corporation)CLEAR, WC Susp PendingC-10 Electrical ContractorJul 17, 2021Jul 31, 202789

License numbers are the ones the utilities recorded on the interconnection applications (89 of 89 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1078291. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Sutter50
Yuba18
Butte7
Placer5
El Dorado2
Tehama2
Fresno1
Glenn1
Monterey1
Nevada1
Solano1

Top cities

CityInstalls
Yuba City36
Sutter9
Marysville7
Plumas Lake6
Live Oak5
Olivehurst4
Biggs3
Rocklin3
Oroville2
Arboga1
Chico1
Clovis1
Cool1
Granite Bay1
Gridley1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ORION SOLAR AND ELECTRIC88
Orion Solar and Electric1

Common questions

Where does ORION SOLAR AND ELECTRIC install solar?

Its installs are spread across 11 counties. The most are in Sutter County (50 installs), followed by Yuba County (18).

How often does ORION SOLAR AND ELECTRIC install batteries with solar?

31.5% of its interconnected solar installs include battery storage across all years, and 92.9% in the last 24 months (13 of 14).

How many ORION SOLAR AND ELECTRIC installs are under NEM 3.0 (the Net Billing Tariff)?

26 of its 89 interconnected installs (29.2% of the 89 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.