Pacific Blue Solar

How many solar installs has Pacific Blue Solar done in California, and which license number is on its installs?

Pacific Blue Solar has 377 residential solar installs interconnected in California, active in the records from 2008 through 2026 (Dec 15, 2008 to May 9, 2026), most of them in Los Angeles County (328), Ventura County (41) and Orange County (2). CSLB lists license 917409 (PACIFIC BLUE SOLAR INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Jun 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
377
Last 24 months
17
Total capacity
3,009.9 kW DC
Median system size
7.3 kW DC
With battery storage
6.6% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 52.9% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
5.5% of 325 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
10 installs, latest May 9, 2026
Ownership types recorded
PPA 10, lease 8
Median battery size
20.2 kWh (25 installs list a capacity)
First install
Dec 15, 2008
Latest install
May 9, 2026
Counties
7
Utilities
SCE 376, SDGE 1
CSLB license
917409

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2008 to 2026

YearInstalls interconnectedWith battery storage
200810
200920
201050
201180
2012210
2013240
2014390
2015660
2016390
2017320
2018230
2019170
2020120
2021136
2022267
2023292
202471
202553
2026 (through Aug 31, 2026)86

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

10 of its 377 interconnected installs (2.7% of the 377 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 80.0% of those include battery storage. The latest Net Billing Tariff install was approved May 9, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.022559.7%not counted
NEM 2.014237.7%17 (12.1%)
Net Billing Tariff102.7%8 (80.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 18 of Pacific Blue Solar’s installs the utility recorded a third-party ownership type: PPA 10, lease 8, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Pacific Blue Solar exactly.

Third-party owner named on its installsInstalls
PVHome PPA 1, LLC8
Kilowatt Systems, LLC3
MYSOLAR 1 LLC3
Greenday Finance 1 LLC2
Sunnova Energy Corporation2

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 17 of Pacific Blue Solar’s 17 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (4, 23.5%) used modules recorded as Canadian Solar.

In the last 24 months, 17 of Pacific Blue Solar’s 17 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (8, 47.1%) used inverters recorded as Enphase.

In the last 24 months, 5 of Pacific Blue Solar’s 17 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (5, 100.0%) used batteries recorded as Tesla.

17 of 25 battery-paired PG&E and SCE installs (68.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar445
EG43not in top list
LONGi3not in top list
Mission Solar313
SolarWorld3119
Inverter makerEnphase8304
Tesla56
EG43not in top list
SMA116
Battery makerTesla55

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 247 of 377 installs, inverters on 377. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Pacific Blue Solar as developer on 9 battery storage projects and as installer on 9 (9 name it as both), 9 projects in all with 243 kWh of storage. 7 have the status Paid, with $184,414 in current incentive allocations. Applications were received from Sep 11, 2020 to Feb 27, 2022.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid7184$184,414
Cancelled258$58,236

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency9243$242,6507$184,414

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
917409PACIFIC BLUE SOLAR INC (Corporation)CLEARC-10 Electrical Contractor; C-46 Solar ContractorJun 11, 2008Jun 30, 2028374

License numbers are the ones the utilities recorded on the interconnection applications (375 of 377 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 917409. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Los Angeles328
Ventura41
Orange2
Riverside2
San Bernardino2
Kern1
San Diego1

Top cities

CityInstalls
Santa Clarita68
Valencia49
Canyon Country46
Saugus45
Newhall41
Castaic20
Acton14
Simi Valley14
Stevenson Ranch10
Thousand Oaks6
Camarillo5
Lancaster5
Palmdale4
Santa Rosa Valley4
Ventura4

Names as recorded by the utilities

The utilities recorded this installer under 8 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
PACIFIC BLUE SOLAR INC149
PACIFIC BLUE SOLAR115
Pacific Blue Solar94
Pacific Blue Solar, Inc.15
Pacific Blue Solar Inc1
Pacific Blue Solar, Inc1
PACIFIC BLUE SOLAR, INC1
PACIFIC BLUE SOLAR, INC.1

Common questions

Where does Pacific Blue Solar install solar?

Its installs are spread across 7 counties. The most are in Los Angeles County (328 installs), followed by Ventura County (41).

How often does Pacific Blue Solar install batteries with solar?

6.6% of its interconnected solar installs include battery storage across all years, and 52.9% in the last 24 months (9 of 17). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Pacific Blue Solar installs are under NEM 3.0 (the Net Billing Tariff)?

10 of its 377 interconnected installs (2.7% of the 377 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 80.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.