PACIFIC ENERGY NETWORK CONSTRUCTION has 446 residential solar installs interconnected in California, active in the records from 2021 through 2025 (Feb 16, 2021 to Aug 27, 2025), most of them in Los Angeles County (166), San Bernardino County (104) and Kern County (85). The license number recorded on most of its installs, 1067054, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
446
Last 24 months
10
Total capacity
3,581.1 kW DC
Median system size
6.7 kW DC
With battery storage
0.7% all time; 10.0% last 24 months
Third-party owned
4.0% of 446 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 11, other 7
Median battery size
9.8 kWh (3 installs list a capacity)
First install
Feb 16, 2021
Latest install
Aug 27, 2025
Counties
12
Utilities
SCE 366, PGE 80
CSLB license
1067054

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
202180
20223632
2023380
2024331
202540
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 446 interconnected installs with a tariff recorded (446) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.0446100.0%3 (0.7%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 18 of PACIFIC ENERGY NETWORK CONSTRUCTION’s installs the utility recorded a third-party ownership type: PPA 11, lease 0, prepaid lease 0, other 7. Across all installers, 2 residential systems list a third-party owner name that matches PACIFIC ENERGY NETWORK CONSTRUCTION exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Sunnova9
PACIFIC ENERGY NETWORK LLC4
PACIFIC ENERGY NETWORK CONSTRUCTION2
Sunrun2
Pacific Energy1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 10 of PACIFIC ENERGY NETWORK CONSTRUCTION’s 10 installs name a module maker in the “Generator Manufacturer” fields, and most of those (7, 70.0%) used modules recorded as Canadian Solar.

In the last 24 months, 10 of PACIFIC ENERGY NETWORK CONSTRUCTION’s 10 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (6, 60.0%) used inverters recorded as SolarEdge.

In the last 24 months, 1 of PACIFIC ENERGY NETWORK CONSTRUCTION’s 10 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as LG.

3 of 3 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar7223
Qcells237
LONGi117
Inverter makerSolarEdge6230
Enphase3137
INVERTER SOLAREDGE1not in top list
SunPower152
Battery makerLG13

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 398 of 446 installs, inverters on 446. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1067054Not found in the CSLB License Master file pulled Nov 4, 2026446

License numbers are the ones the utilities recorded on the interconnection applications (446 of 446 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles166
San Bernardino104
Kern85
Orange47
Riverside14
Tulare12
Fresno6
Kings5
Ventura4
Madera1
San Luis Obispo1
Solano1

Top cities

CityInstalls
Bakersfield45
San Bernardino33
Palmdale19
Altadena18
Rialto15
Pomona14
Delano13
Fullerton13
Ontario12
Lancaster10
Laguna Beach9
Pico Rivera9
Arvin8
West Covina8
Buena Park7

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
PACIFIC ENERGY NETWORK CONSTRUCTION445
PACIFIC-ENERGY-NETWORK-CONSTRUCTION1

Common questions

Where does PACIFIC ENERGY NETWORK CONSTRUCTION install solar?

Its installs are spread across 12 counties. The most are in Los Angeles County (166 installs), followed by San Bernardino County (104).

How often does PACIFIC ENERGY NETWORK CONSTRUCTION install batteries with solar?

0.7% of its interconnected solar installs include battery storage across all years, and 10.0% in the last 24 months (1 of 10).

How many PACIFIC ENERGY NETWORK CONSTRUCTION installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 446 interconnected installs with a tariff recorded (446) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.