Poco Solar Energy, Inc.

How many solar installs has Poco Solar Energy, Inc. done in California, and which license number is on its installs?

Poco Solar Energy, Inc. has 639 residential solar installs interconnected in California, active in the records from 2004 through 2026 (Jan 14, 2004 to Jul 10, 2026), most of them in Santa Clara County (422), San Mateo County (136) and Santa Cruz County (61). CSLB lists license 879366 (POCO SOLAR ENERGY INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-46, expires Jun 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
639
Last 24 months
34
Total capacity
4,073 kW DC
Median system size
5.8 kW DC
With battery storage
4.9% all time; 67.6% last 24 months
Third-party owned
0.0% of 639 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
38 installs, latest Jun 16, 2026
Ownership types recorded
none recorded
Median battery size
16 kWh (22 installs list a capacity)
First install
Jan 14, 2004
Latest install
Jul 10, 2026
Counties
7
Utilities
PGE 639
CSLB license
879366

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2004 to 2026

YearInstalls interconnectedWith battery storage
2004120
200550
2006140
2007140
2008140
2009200
2010400
2011360
2012430
2013430
2014380
2015350
2016240
2017280
2018340
2019370
2020300
2021443
2022371
2023400
2024216
2025169
2026 (through Aug 31, 2026)1412

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

38 of its 639 interconnected installs (5.9% of the 639 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 68.4% of those include battery storage. The latest Net Billing Tariff install was approved Jun 16, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.033852.9%not counted
NEM 2.026341.2%5 (1.9%)
Net Billing Tariff385.9%26 (68.4%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Poco Solar Energy, Inc.’s installs. No residential system in the file lists a third-party owner name that matches Poco Solar Energy, Inc. exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 34 of Poco Solar Energy, Inc.’s 34 installs name a module maker in the “Generator Manufacturer” fields, and most of those (24, 70.6%) used modules recorded as REC.

In the last 24 months, 34 of Poco Solar Energy, Inc.’s 34 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (14, 41.2%) used inverters recorded as PointGuard Energy Inc..

In the last 24 months, 23 of Poco Solar Energy, Inc.’s 34 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (14, 60.9%) used batteries recorded as PointGuard Energy Inc..

30 of 31 battery-paired PG&E and SCE installs (96.8%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC2429
Hyundai5not in top list
Panasonic5169
Qcells1not in top list
Inverter makerPointGuard Energy Inc.14not in top list
SolarEdge14319
Enphase725
Battery makerPointGuard Energy Inc.1414
Enphase55
LG310
SolarEdge11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 637 of 639 installs, inverters on 639. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Poco Solar Energy, Inc. as developer on 1 battery storage project and as installer on 1 (1 name it as both), 1 projects in all with 26 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Oct 2, 2026 to Oct 2, 2026.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Pending Reservation126$15,190

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Residential Solar and Storage Equity - AB 209 Non-POU126$15,1900$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
879366POCO SOLAR ENERGY INC (Corporation)CLEARB General Building Contractor; C-46 Solar ContractorJun 13, 2006Jun 30, 2028392

License numbers are the ones the utilities recorded on the interconnection applications (392 of 639 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 879366. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Santa Clara422
San Mateo136
Santa Cruz61
San Benito7
Alameda6
Monterey4
Contra Costa3

Top cities

CityInstalls
San Jose147
Morgan Hill46
Gilroy41
Los Altos41
Saratoga36
Santa Cruz29
Los Gatos26
Redwood City26
Menlo Park25
Sunnyvale21
Atherton18
Mountain View18
Los Altos Hills13
Scotts Valley12
Burlingame11

Names as recorded by the utilities

The utilities recorded this installer under 14 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
POCO SOLAR ENERGY INC215
Poco Solar Energy, Inc.182
POCO Solar Energy inc120
POCO Solar Energy39
Poco Solar Energy37
Poco Solar Energy, Inc11
POCO Solar Energy, Inc.10
POCO Solar Energy, Inc9
Poco Solar Energy Inc4
POCO Solar Energy Inc4
Poco Solar Energy Inc.4
POCO SOLAR ENERGY2
POCO Solar Energy Inc.1
Poco Solar Energy, INC1

Common questions

Where does Poco Solar Energy, Inc. install solar?

Its installs are spread across 7 counties. The most are in Santa Clara County (422 installs), followed by San Mateo County (136).

How often does Poco Solar Energy, Inc. install batteries with solar?

4.9% of its interconnected solar installs include battery storage across all years, and 67.6% in the last 24 months (23 of 34).

How many Poco Solar Energy, Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

38 of its 639 interconnected installs (5.9% of the 639 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 68.4% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.