PROGRESSIVE ENERGY

How many solar installs has PROGRESSIVE ENERGY done in California, and which license number is on its installs?

PROGRESSIVE ENERGY has 357 residential solar installs interconnected in California, active in the records from 2010 through 2015 (Mar 10, 2010 to Sep 8, 2015), most of them in San Bernardino County (187), Riverside County (146) and Los Angeles County (14). CSLB lists license 926487 (PROGRESSIVE ENERGY SOLUTIONS INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-46, expires Dec 31, 2026.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
357
Last 24 months
0
Total capacity
1,843.3 kW DC
Median system size
4.9 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
33.8% of 198 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 47, lease 18, other 2
First install
Mar 10, 2010
Latest install
Sep 8, 2015
Counties
4
Utilities
SCE 357
CSLB license
926487

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2010 to 2026

YearInstalls interconnectedWith battery storage
2010230
2011370
2012650
2013700
2014960
2015660
201600
201700
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 357 interconnected installs with a tariff recorded (357) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0357100.0%not counted
NEM 2.000.0%0
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 67 of PROGRESSIVE ENERGY’s installs the utility recorded a third-party ownership type: PPA 47, lease 18, prepaid lease 0, other 2. No residential system in the file lists a third-party owner name that matches PROGRESSIVE ENERGY exactly.

Third-party owner named on its installsInstalls
PV Home PPA 1, LLC17
PVHome PPA 1, LLC15
Kilowatt Systems, LLC12
MYSOLAR 1 LLC9
Greenday Finance I LLC5

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 7 of PROGRESSIVE ENERGY’s 357 installs name a module maker in the “Generator Manufacturer” fields, and most of those (4, 57.1%) used modules recorded as SolarWorld.

Across all years, 357 of PROGRESSIVE ENERGY’s 357 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (314, 88.0%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSolarWorld04
SunEdison02
Sun Edison01
Inverter makerEnphase0314
SMA030
Fronius011
Kaco02
Power-One01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 7 of 357 installs, inverters on 357. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
926487PROGRESSIVE ENERGY SOLUTIONS INC (Corporation)CLEARB General Building Contractor; C-46 Solar ContractorDec 19, 2008Dec 31, 2026357

License numbers are the ones the utilities recorded on the interconnection applications (357 of 357 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 926487. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list PROGRESSIVE ENERGY’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20182024Total
unincorporated San Diego County926487516

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Bernardino187
Riverside146
Los Angeles14
Orange10

Top cities

CityInstalls
Yucaipa76
San Bernardino21
Moreno Valley19
Corona17
Redlands17
Beaumont16
Fontana16
Highland15
Menifee13
Murrieta13
Hemet10
Riverside9
Winchester9
Rancho Cucamonga8
Apple Valley7

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
PROGRESSIVE ENERGY357

Common questions

Where does PROGRESSIVE ENERGY install solar?

Its installs are spread across 4 counties. The most are in San Bernardino County (187 installs), followed by Riverside County (146).

How often does PROGRESSIVE ENERGY install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many PROGRESSIVE ENERGY installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 357 interconnected installs with a tariff recorded (357) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.