Progressive Energy Solutions, Inc.

How many solar installs has Progressive Energy Solutions, Inc. done in California, and which license number is on its installs?

Progressive Energy Solutions, Inc. has 211 residential solar installs interconnected in California, active in the records from 2009 through 2026 (Jul 27, 2009 to Jun 1, 2026), most of them in San Bernardino County (102), Riverside County (71) and San Diego County (16). CSLB lists license 926487 (PROGRESSIVE ENERGY SOLUTIONS INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-46, expires Dec 31, 2026.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
211
Last 24 months
6
Total capacity
1,682.4 kW DC
Median system size
7.2 kW DC
With battery storage
3.2% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 100.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.5% of 205 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
3 installs, latest May 12, 2026
Ownership types recorded
PPA 1
Median battery size
17.5 kWh (6 installs list a capacity)
First install
Jul 27, 2009
Latest install
Jun 1, 2026
Counties
6
Utilities
SCE 188, SDGE 22, PGE 1
CSLB license
926487

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2009 to 2026

YearInstalls interconnectedWith battery storage
200920
201010
201120
201210
201310
201410
2015330
2016440
2017540
2018440
201980
202020
202120
202250
202351
202421
202522
2026 (through Aug 31, 2026)22

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

3 of its 211 interconnected installs (1.4% of the 211 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved May 12, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.012056.9%not counted
NEM 2.08841.7%4 (5.3%)
Net Billing Tariff31.4%2 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 1 of Progressive Energy Solutions, Inc.’s installs the utility recorded a third-party ownership type: PPA 1, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Progressive Energy Solutions, Inc. exactly.

Third-party owner named on its installsInstalls
Sun Edison1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 6 of Progressive Energy Solutions, Inc.’s 6 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (3, 50.0%) used modules recorded as Qcells.

In the last 24 months, 6 of Progressive Energy Solutions, Inc.’s 6 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (6, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 5 of Progressive Energy Solutions, Inc.’s 6 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (5, 100.0%) used batteries recorded as Enphase.

6 of 6 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells322
SunPower1not in top list
Suntech1not in top list
Trina Solar1not in top list
Znshine1not in top list
Inverter makerEnphase6195
Battery makerEnphase56

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 205 of 211 installs, inverters on 211. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Progressive Energy Solutions, Inc. as developer on 3 battery storage projects and as installer on 3 (3 name it as both), 3 projects in all with 73 kWh of storage. 2 have the status Paid, with $44,118 in current incentive allocations. Applications were received from Sep 14, 2023 to Sep 9, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid244$44,118
Reserved129$29,118

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency373$73,2362$44,118

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
926487PROGRESSIVE ENERGY SOLUTIONS INC (Corporation)CLEARB General Building Contractor; C-46 Solar ContractorDec 19, 2008Dec 31, 2026156

License numbers are the ones the utilities recorded on the interconnection applications (156 of 211 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 926487. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Progressive Energy Solutions, Inc.’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20182024Total
unincorporated San Diego County926487516

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Bernardino102
Riverside71
San Diego16
Orange15
Los Angeles6
San Joaquin1

Top cities

CityInstalls
Yucaipa33
Redlands14
Beaumont10
Moreno Valley9
Highland8
San Bernardino8
Calimesa5
Hemet5
Rancho Cucamonga5
Riverside5
Victorville5
Alta Loma4
Chula Vista4
Corona4
Murrieta4

Names as recorded by the utilities

The utilities recorded this installer under 12 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Progressive Energy Solutions, Inc.126
Progressive Energy Solutions Inc.30
PROGRESSIVE ENERGY SOLUTIONS INC20
Progressive Energy Solutions Inc17
Progressive Energy Solutions4
PROGRESSIVE ENERGY SOLUTIONS INC.4
Progressive Energy Solutions, Inc3
PROGRESSIVE ENERGY SOLUTIONS, INC3
Progressive Energy Solutions INc1
Progressive Energy solutions Inc.1
Progressive Energy Solutions, INC1
Progressive Energy Solutions, inc.1

Common questions

Where does Progressive Energy Solutions, Inc. install solar?

Its installs are spread across 6 counties. The most are in San Bernardino County (102 installs), followed by Riverside County (71).

How often does Progressive Energy Solutions, Inc. install batteries with solar?

3.2% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (5 of 5). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Progressive Energy Solutions, Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

3 of its 211 interconnected installs (1.4% of the 211 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.