Revco Solar Engineering, Inc.

How many solar installs has Revco Solar Engineering, Inc. done in California, and which license number is on its installs?

Revco Solar Engineering, Inc. has 428 residential solar installs interconnected in California, active in the records from 2003 through 2026 (Jul 25, 2003 to Apr 8, 2026), most of them in Orange County (290), San Diego County (51) and Riverside County (38). CSLB lists license 387219 (REVCO SOLAR ENGINEERING INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-46, expires Feb 29, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
428
Last 24 months
12
Total capacity
3,221.5 kW DC
Median system size
7.2 kW DC
With battery storage
6.2% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 58.3% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
2.9% of 344 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
8 installs, latest Jan 24, 2026
Ownership types recorded
lease 9, other 1
Median battery size
10 kWh (14 installs list a capacity)
First install
Jul 25, 2003
Latest install
Apr 8, 2026
Counties
6
Utilities
SCE 225, SDGE 203
CSLB license
387219

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2003 to 2026

YearInstalls interconnectedWith battery storage
200350
200440
200550
200620
200760
200810
200970
201040
201190
201260
2013110
2014180
2015570
2016680
2017230
2018330
2019341
2020252
2021130
2022400
2023413
202451
202596
2026 (through Aug 31, 2026)21

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

8 of its 428 interconnected installs (1.9% of the 428 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 71.4% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Jan 24, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.020247.2%not counted
NEM 2.021850.9%9 (7.0%)
Net Billing Tariff81.9%5 (71.4%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 10 of Revco Solar Engineering, Inc.’s installs the utility recorded a third-party ownership type: PPA 0, lease 9, prepaid lease 0, other 1. Across all installers, 9 residential systems list a third-party owner name that matches Revco Solar Engineering, Inc. exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
SunPower Capital, LLC8
Revco Solar Engineering1
SunPower1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 10 of Revco Solar Engineering, Inc.’s 12 installs name a module maker in the “Generator Manufacturer” fields, and most of those (6, 60.0%) used modules recorded as REC.

In the last 24 months, 12 of Revco Solar Engineering, Inc.’s 12 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (12, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 7 of Revco Solar Engineering, Inc.’s 12 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (6, 85.7%) used batteries recorded as Enphase.

14 of 14 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC6not in top list
Hyundai2not in top list
Solaria280
Inverter makerEnphase1265
Battery makerEnphase610
FranklinWH11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 394 of 428 installs, inverters on 386. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Revco Solar Engineering, Inc. as developer on 1 battery storage project and as installer on 1 (1 name it as both), 1 projects in all with 8 kWh of storage. 1 have the status Paid, with $1,225 in current incentive allocations. Applications were received from Jan 31, 2020 to Jan 31, 2020.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid18$1,225

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage18$1,2251$1,225

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
387219REVCO SOLAR ENGINEERING INC (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-46 Solar ContractorFeb 14, 1980Feb 29, 2028318

License numbers are the ones the utilities recorded on the interconnection applications (320 of 428 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 387219. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Revco Solar Engineering, Inc.’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2022Total
unincorporated San Diego County38721922

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Orange290
San Diego51
Riverside38
San Bernardino25
Los Angeles23
Ventura1

Top cities

CityInstalls
San Juan Capo40
Mission Viejo32
San Clemente29
Laguna Hills25
Laguna Niguel18
Coto de Caza17
Orange17
Huntington Beach16
Dana Point15
Ladera Ranch10
Santa Ana10
Tustin10
Long Beach8
Yorba Linda8
Fullerton7

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Revco Solar Engineering, Inc.206
REVCO SOLAR ENGINEERING INC141
Revco Solar Engineering Inc79
REVCO SOLAR Engineering Inc1
revco solar engineering, Inc.1

Common questions

Where does Revco Solar Engineering, Inc. install solar?

Its installs are spread across 6 counties. The most are in Orange County (290 installs), followed by San Diego County (51).

How often does Revco Solar Engineering, Inc. install batteries with solar?

6.2% of its interconnected solar installs include battery storage across all years, and 58.3% in the last 24 months (7 of 12). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Revco Solar Engineering, Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

8 of its 428 interconnected installs (1.9% of the 428 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 71.4% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.