How many solar installs has S Q ELECTRICAL CONSTRUCTION done in California, and which license number is on its installs?

S Q ELECTRICAL CONSTRUCTION has 166 residential solar installs interconnected in California, active in the records from 2020 through 2026 (Sep 21, 2020 to Jul 14, 2026), most of them in Fresno County (109), Madera County (29) and Mariposa County (8). The license number recorded on most of its installs, 1065106, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
166
Last 24 months
3
Total capacity
1,603.6 kW DC
Median system size
8.9 kW DC
With battery storage
12.7% all time; 0.0% last 24 months
Third-party owned
1.8% of 166 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
8 installs, latest Jul 14, 2026
Ownership types recorded
PPA 1, lease 2
Median battery size
10 kWh (16 installs list a capacity)
First install
Sep 21, 2020
Latest install
Jul 14, 2026
Counties
11
Utilities
PGE 165, SCE 1
CSLB license
1065106

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2020 to 2026

YearInstalls interconnectedWith battery storage
2020180
2021552
20224212
2023413
202474
202510
2026 (through Aug 31, 2026)20

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

8 of its 166 interconnected installs (4.8% of the 166 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 62.5% of those include battery storage. The latest Net Billing Tariff install was approved Jul 14, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.015895.2%16 (10.1%)
Net Billing Tariff84.8%5 (62.5%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 3 of S Q ELECTRICAL CONSTRUCTION’s installs the utility recorded a third-party ownership type: PPA 1, lease 2, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches S Q ELECTRICAL CONSTRUCTION exactly.

Third-party owner named on its installsInstalls
SolKraft PPA2
Sunrun Inc.1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 3 of S Q ELECTRICAL CONSTRUCTION’s 3 installs name a module maker in the “Generator Manufacturer” fields, and most of those (2, 66.7%) used modules recorded as Qcells.

In the last 24 months, 3 of S Q ELECTRICAL CONSTRUCTION’s 3 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (2, 66.7%) used inverters recorded as Enphase.

In the last 24 months, none of S Q ELECTRICAL CONSTRUCTION’s 3 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

14 of 21 battery-paired PG&E and SCE installs (66.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells2130
Canadian Solar13
Inverter makerEnphase253
Sol-Ark1not in top list
Battery makerGenerac07
SolarEdge03
LG02
Enphase01
Shenzhen Eternalplanet Energy Pingshan Ltd.01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 154 of 166 installs, inverters on 166. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1065106Not found in the CSLB License Master file pulled Nov 4, 2026165

License numbers are the ones the utilities recorded on the interconnection applications (166 of 166 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Fresno109
Madera29
Mariposa8
Merced8
Kings3
Tulare3
San Benito2
Kern1
Santa Cruz1
Solano1
Stanislaus1

Top cities

CityInstalls
Fresno61
Clovis41
Madera18
Mariposa8
Coarsegold4
Merced4
Friant3
Lemoore3
Los Banos3
Hollister2
North Fork2
Bakersfield1
Bass Lake1
Boulder Creek1
Chowchilla1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
S Q ELECTRICAL CONSTRUCTION166

Common questions

Where does S Q ELECTRICAL CONSTRUCTION install solar?

Its installs are spread across 11 counties. The most are in Fresno County (109 installs), followed by Madera County (29).

How often does S Q ELECTRICAL CONSTRUCTION install batteries with solar?

12.7% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 3).

How many S Q ELECTRICAL CONSTRUCTION installs are under NEM 3.0 (the Net Billing Tariff)?

8 of its 166 interconnected installs (4.8% of the 166 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 62.5% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.